Expansion of capacity M railway 74, Pova ská Bystrica (Q3100867)
Jump to navigation
Jump to search
Project Q3100867 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Expansion of capacity M railway 74, Pova ská Bystrica |
Project Q3100867 in Slovakia |
Statements
389,216.72 Euro
0 references
457,902.02 Euro
0 references
0.85 percent
0 references
1 September 2018
0 references
1 August 2020
0 references
Mesto Povaská Bystrica
0 references
Q3120055 (Deleted Item)
0 references
Materská kola elezničná v Meste Povaská Bystrica má momentálnu kapacitu 183 detí. Objekt bol postavený v roku 1977 podža projektovej dokumentácie a stavebno-technických poiadaviek a noriem platných v tom období, v súčasnosti u nevyhovuje technickým poiadavkám a neposkytuje priestor pre rozírenie kapacity koly bez stavebných úprav a nadstavby. Má 7 riadnych tried s prísluenstvom, hospodársky pavilón s kuchyňou, práčovňou a priestormi pre administratívu. Pre vežký záujem o umiestnenie detí v M sú triedy napĺňané na maximálne monú hranicu. Ciež sa dosiahne prestavbou a nadstavbou jestvujúceho pavilónu D, čím sa priestorovo dosiahne zvyovanie kapacít miest o 40 detí, ako aj zníenie energetickej náročnosti budovy. Realizáciou projektu sa tie riei úprava vonkajieho areálu, detského ihriska a obstaranie potrebného materiálno-technického vybavenia tried. (Slovak)
0 references
The Maternity Round Railway in Povaská Bystrica has a current capacity of 183 children. The building was built in 1977 under the design documentation and building and technical requirements and standards applicable at that time, currently it does not meet the technical requirements and does not provide space for expansion of the capacity of the wheel without building modifications and superstructure. It has 7 regular classes with accessories, an economic pavilion with kitchen, laundry and administrative space. For a great interest in the placement of children in M, the classes are filled to the maximum possible limit. The aim is to be achieved through the conversion and superstructure of the existing Pavilion D, thus achieving spatially increasing the capacity of the cities by 40 children, as well as reducing the energy intensity of the building. The implementation of the project also solves the adjustment of the outdoor area, children’s playground and the acquisition of the necessary material and technical equipment classes. (English)
15 September 2021
0 references
Identifiers
302021H957
0 references