Reconstruction of sewage pumping station and sewage and discharge network on plots No 140/2, 139/7 area 0005 Łagów (Q2699875)

From EU Knowledge Graph
Revision as of 18:24, 21 September 2021 by DG Regio (talk | contribs) (‎Changed claim: EU contribution (P835): 262,925.21 euro)
Jump to navigation Jump to search
Project Q2699875 in Poland
Language Label Description Also known as
English
Reconstruction of sewage pumping station and sewage and discharge network on plots No 140/2, 139/7 area 0005 Łagów
Project Q2699875 in Poland

    Statements

    0 references
    1,182,749.5 zloty
    0 references
    262,925.21 Euro
    0.2223 Euro
    0 references
    1,391,470.0 zloty
    0 references
    309,323.78 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    4 May 2020
    0 references
    30 November 2021
    0 references
    GMINA ŁAGÓW
    0 references
    0 references

    52°19'59.2"N, 15°17'49.2"E
    0 references
    Projekt realizowany będzie na terenie Aglomeracji Łagów utworzonej Uchwałą Sejmiku Woj. Lubuskiego nr 11/2016 Agl. zgłoszona została do V aktualizacji KPOŚK. Przedmiotem projektu jest przebudowa posiadanej infrastruktury komunalnej (przepompowni ściek. i sieci kan.), zapewniającej odprowadzanie i efektywne oczyszczanie ścieków dla mieszkańców miejscowości Łagów. Istniejąca przepompownia zbiera ścieki z miejscowości Łagów, Łagówek, Jemiołów. Sieniawa, Wielopole. Zarówno pompy w przepompowni jak i istniejące urządzenia oraz rurociągi są w bardzo złym stanie technicznym. Obecna zabudowa zagraża bezpieczeństwu osób przebywających w bezpośrednim sąsiedztwie obiektu.Realizacja projektu pozwoli na płynne odprowadzenie ścieków sanitarnych z miejscowości Łagów oraz zabezpieczy okoliczne jezioro przed niekontrolowanymi wyciekami ścieków. Celami projektu są: • Przebudowa na odpowiednie systemy odbioru ścieków komunalnych infrastruktury kanalizacyjnej w miejscowości Łagów, • Redukcja zanieczyszczeń gleby, wód podziemnych oraz powierzchniowych, w drodze przebudowy infrastruktury kanalizacyjnej na terenie Aglomeracji Łagów, • Poprawa warunków życia mieszkańców g.Łagów, • Stworzenie wysokich standardów ekologicznych na terenie gminy Łagów poprzez poprawę funkcjonowania infrastruktury ochrony środowiska, • Podniesienie atrakc. inwestycyjnej i turystycznej g.Łagów, • Zwiększenie konkurenc. i atrakcyjności regionu poprzez tworzenie warunków dla zrównoważ.rozwoju. Grupy docelowe pr.: mieszkańcy g. Łagów, turyści, inwestorzy. Planuje się realizację następujących zadań: roboty budowlane i montażowe, nadzór inwestorski, promocja projektu. Koszty całkowite projektu: 2 038 819,40 PLN, w tym kwalifik. 1 391 470,00 PLN. Podatek VAT - niekwalif. Wnioskodawca posiada kompletną dokumentację tech., SW, niezbędne opinie, uzgodnienia i pozwolenia a także zasoby i doświadczenie umożliwiające realizację projektu. Osiągnięte zostaną następujące wskaźniki: - Dł. przebudowanej kanalizacj (Polish)
    0 references
    The project will be carried out on the premises of the Lag Agglomeration created by the Resolution of the Sejmiku Wojiku. Lubuski No 11/2016 Agl. was notified to the 5th update of the KPOŚK. The object of the project is the reconstruction of existing municipal infrastructure (water pumping station and canal network) ensuring the collection and efficient treatment of waste water for the inhabitants of Łagów. The existing pumping station collects sewage from the towns of Łagów, Łagówek and Jemiołów. Sieniewa, Wielopole. Both pumps in the pumping station and existing equipment and pipelines are in very poor technical condition. The current building threatens the safety of people in the immediate vicinity of the facility. The implementation of the project will allow for the smooth discharge of sanitary wastewater from the town of Łagów and will protect the surrounding lake against uncontrolled leakage of waste water. The objectives of the project are: • Conversion to appropriate wastewater collection systems of sewerage infrastructure in Łagów, • Reduction of pollution of soil, groundwater and surface water, by means of reconstruction of sewerage infrastructure in the area of the Lagów Agglomeration, • Improvement of living conditions of inhabitants of g.Łagów, • Creating high ecological standards in the municipality of Łagów by improving the functioning of environmental protection infrastructure, • Increase investment and tourist attraction of g.Łagów, • Increase the competition and attractiveness of the region by creating conditions for sustainable development. Target groups: residents of the region of Laga, tourists, investors. The following tasks are planned: construction and assembly works, investor supervision, project promotion. Total costs of the project: PLN 2 038 819.40, including eligibility. PLN 1 391 470.00. VAT – unqualified. The applicant has complete technical documentation., SW, the necessary opinions, arrangements and permits, as well as resources and experience to implement the project. The following indicators will be achieved: — Reconstructed sewerage (English)
    7 July 2021
    0 references

    Identifiers

    RPLB.04.03.00-08-0003/20
    0 references