Modernisation of the road III. Class 1113 Horho ník – Malacky (Q3100759)
Jump to navigation
Jump to search
Project Q3100759 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the road III. Class 1113 Horho ník – Malacky |
Project Q3100759 in Slovakia |
Statements
3,468,747.06 Euro
0 references
6,937,494.12 Euro
0 references
0.5 percent
0 references
1 July 2018
0 references
1 October 2019
0 references
Bratislavský samosprávny kraj
0 references
Ciežom projektu Modernizácia cesty III. triedy 1113 Rohoník-Malacky" je rekontrukcia cesty III/1113 Rohoník - Malacky, prostredníctvom IROP v rámci prioritnej osi č.1: Bezpečná a ekologická doprava v regiónoch. Cesta III/1113 Rohoník - Malacky s napojením na diažnicu D2, ktorá patrí do hlavnej siete TEN-T v rámci koridoru ORIENT/EAST-MED, je kžúčovou cestnou komunikáciou medzi okresným mestom Malacky a okolitými obcami. Cesta predstavuje najrýchlejie dopravné spojenie do okresného mesta pre obce Rohoník, Solonica, Kuchyňa, Plavecké Podhradie a Plavecký Mikulá, teda pre pribline 8,5 tisíca obyvatežov dotknutých obcí. Cesta má navye nadregionálny význam, nakožko predstavuje najrýchlejie napojenie na diažnicu D2 pre obce Plavecký Peter, Prievaly, Cerová, Buková, Osuské a Jablonica v Trnavskom kraji. Okrem individuálnej osobnej dopravy je cesta vyuívaná aj nákladnou a verejnou osobnou dopravou. Z dôvodu nevyhovujúceho írkového usporiadania cesty III/1113 sa v roku 2011 pristúpilo k zjednosmerneniu premávky nákladnej dopravy nad 12 ton v smere Rohoník-Malacky. Vzniknutá situácia je rieená obchádzkou cez obce Pernek a Kuchyňa,čo negatívne vplýva na pribline 2600 obyvatežov spomínaných obcí. Cesta III/1113 je strategickým napojením na ostatnú cestnú sie pre viaceré výrobné závody spoločností pôsobiacich v oblasti. Kžúčovou úlohou cesty III/1113 Rohoník Malacky, je predovetkým zabezpečenie rýchleho napojenia na TEN-T a priameho vstupu na Vnútorný trh Európskej únie. Zrekontruovaná cesta III/1113 medzi Malackami a Rohoníkom predstavuje z hžadiska času a vzdialenosti a teda aj z hžadiska dopadu na ivotné prostredie najvýhodnejie prepojenie dotknutých obcí v regióne s okresným mestom Malacky a s diažnicou D2. Modernizáciou cesty III/1113 sa zníia prevádzkové náklady na jej opravu a údrbu. Z hžadiska meratežných ukazovatežov, je ciežom projektu zrekontruova 7,787 km cesty a získa úsporu času v cestnej doprave na ceste III/1113 Rohoník-Malacky v hodnote 20 897 EUR ku koncu realizácie projektu pričom táto hodnota v zmysle vypracovanej CBA kadoročne narastá. (Slovak)
0 references
The objective of the project Modernisation of the road III. Class 1113 Roof-Malacky" is the reconstruction of road III/1113 Rohoník – Malacky, through IROP under priority axis No.1: Safe and clean transport in the regions. Road III/1113 Rohoník – Malacky with connection to D2 diažnica, which belongs to the main TEN-T network within the ORIENT/EAST-MED corridor, is a key road communication between the district town of Malacky and the surrounding municipalities. The road is the fastest transport connection to the district town for the villages Rohoník, Solonica, Kuchyňa, Plavecké Podhradie and Plavecký Mikulá, that is, for the 8,5 thousand inhabitants of the affected municipalities. The road has a supra-regional importance, as well as the fastest connection to the D2 diažnica for the villages Plavecký Peter, Prievaly, Cerová, Buková, Osuské and Jablonica in Trnava region. In addition to individual passenger transport, the journey is also used by freight and public passenger transport. Due to the unsatisfactory structure of road III/1113, freight traffic of more than 12 tonnes in the direction of Rohoník-Malacky was unidirectional in 2011. The situation is solved by a detour through the villages Pernek and Kuchyňa, which negatively affects the area of 2600 inhabitants of the mentioned villages. Road III/1113 is a strategic link to the other road network for several production plants of companies operating in the area. The key task of road III/1113 Malacky Roofing is, in particular, to ensure a rapid connection to the TEN-T and direct entry to the European Union’s Internal Market. The reconstructed road III/1113 between Malacky and Rohoník represents the most advantageous connection of the affected municipalities in the region with the district town Malacky and with the D2 diažnica, from the hinterland of time and thus from the impact on the environment. The modernisation of road III/1113 will reduce the operating costs for its repair and maintenance. From the demand for measurement indicators, the project aims to recontrude 7.787 km of road and will save time in road transport on road III/1113 Rohoník-Malacky worth EUR 20897 towards the end of the project implementation, and this value in terms of the CBA is growing every year. (English)
15 September 2021
0 references
Identifiers
302011F620
0 references