Remodeling of Residential Structure for Elderly People (Q2898352)

From EU Knowledge Graph
Revision as of 08:01, 8 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): With this intervention, the institution will have capacity for 28 users, intends with this project to respond to the numerous requests of the parish as well as of the neighbouring parishes and thus contribute to the significant decrease of the waiting list of users and consequently contribute to the reduction of the isolation of the elderly., translated_summary)
Jump to navigation Jump to search
Project Q2898352 in Portugal
Language Label Description Also known as
English
Remodeling of Residential Structure for Elderly People
Project Q2898352 in Portugal

    Statements

    0 references
    299,993.96 Euro
    0 references
    83.0 percent
    0 references
    31 March 2021
    0 references
    30 March 2023
    0 references
    CENTRO SOCIAL PAROQUIAL DE VILA NOVA DE ANHA
    0 references
    0 references

    41°39'57.49"N, 8°47'45.28"W
    0 references
    Com esta intervenção, a Instituição terá capacidade para 28 utentes, Pretende-se com este projeto dar resposta às inúmeros solicitações da freguesia bem como das freguesias limítrofes e desta forma contribuir para a diminuição significativa da lista de espera de utentes e consequentemente contribuir para a diminuição do isolamento do idoso. (Portuguese)
    0 references
    With this intervention, the institution will have capacity for 28 users, intends with this project to respond to the numerous requests of the parish as well as of the neighbouring parishes and thus contribute to the significant decrease of the waiting list of users and consequently contribute to the reduction of the isolation of the elderly. (English)
    8 July 2021
    0 references
    Viana do Castelo, Anha
    0 references

    Identifiers

    NORTE-07-4842-FEDER-000368
    0 references