Cycling corridor of the parish of Quintinha – Alcácer do Sal (Q2863235)

From EU Knowledge Graph
Revision as of 18:47, 7 July 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q2863235 in Portugal
Language Label Description Also known as
English
Cycling corridor of the parish of Quintinha – Alcácer do Sal
Project Q2863235 in Portugal

    Statements

    0 references
    83,667.94 Euro
    0 references
    85.0 percent
    0 references
    15 August 2016
    0 references
    15 August 2017
    0 references
    MUNICÍPIO DE ALCÁCER DO SAL
    0 references

    38°24'16.60"N, 8°36'19.58"W
    0 references
    O Corredor ciclável da Quintinha corresponde à materialização dos corredores cicláveis apontados para a "viabilização de deslocações de natureza quotidiana do bairro periférico - Bairro da Quintinha e a zona ribeirinha/centro histórico da cidade, potenciando também uma utilização mais intensa do corredor ciclável já existente na zona ribeirinha Poente." (Portuguese)
    0 references
    The Quintinha cyclable Corridor corresponds to the materialisation of the cyclable corridors pointed out for the “viabilisation of travels of a daily nature of the parish peripheral – parish of Quintinha and the riverside area/historic centre of the city, also boosting a more intense use of the cycling corridor already existing in the riverside zone Poente.” (English)
    6 July 2021
    0 references
    Alcácer do Sal, União das freguesias de Alcácer do Sal (Santa Maria do Castelo e Santiago) e Santa Susana
    0 references

    Identifiers

    ALT20-04-1406-FEDER-000008
    0 references