Suk-R.oFA Implementation of measures from cycling and footpath network concept – Grünbach/Fr. (Q3061527)

From EU Knowledge Graph
Revision as of 09:55, 22 July 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q3061527 in Austria
Language Label Description Also known as
English
Suk-R.oFA Implementation of measures from cycling and footpath network concept – Grünbach/Fr.
Project Q3061527 in Austria

    Statements

    0 references
    0 references
    273,888.57 Euro
    0 references
    1 October 2019
    0 references
    31 October 2021
    0 references
    Gemeinde Grünbach/Fr.
    0 references
    0 references

    48°32'11.54"N, 14°32'11.51"E
    0 references
    40602
    0 references
    In 2018, the city of Freistadt has a city reg. Strategy drawn up in accordance with Article 7(1) of the Regulation (EU) 1301/2013. Based on this, the foot and cycle path network is expanded and measures are implemented in the municipality of Grünbach/Fr. (English)
    20 July 2021
    0 references
    2018 hat die Stadtregion Freistadt eine Stadtreg. Strategie gem. Art. 7 Abs 1 der VO (EU) 1301/2013 erarbeitet. Darauf aufbauend wird das Fuß- u. Radwegenetz ausgebaut und Maßn. in d. Gemeinde Grünbach / Fr. umgesetzt. (Austrian German)
    0 references
    Grünbach
    0 references

    Identifiers

    AUST-1239
    0 references