“Investments in renewable energy sources by BWP SKÓRKIEWICZ SPÓŁKA JAWNA” (Q2717273)

From EU Knowledge Graph
Revision as of 01:54, 8 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2717273 in Poland
Language Label Description Also known as
English
“Investments in renewable energy sources by BWP SKÓRKIEWICZ SPÓŁKA JAWNA”
Project Q2717273 in Poland

    Statements

    0 references
    0 references
    437,750.0 zloty
    0 references
    97,311.82 Euro
    0.2223 Euro
    0 references
    515,000.0 zloty
    0 references
    114,484.5 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    23 May 2018
    0 references
    31 March 2021
    0 references
    BWP SKÓRKIEWICZ SPÓŁKA JAWNA
    0 references
    0 references

    54°2'23.3"N, 22°29'36.2"E
    0 references
    Inwestycja polega na zakupie i montażu w m. Olecko, nr działki 3263 , obręb 0002 Olecko: - instalacji fotowoltaicznej dachowej–172 paneli (polikrystalicznych o mocy jednostkowej 290 W) o mocy 49,88 kW z 2 falownikami o łącznej mocy 44 kW (o mocy jednostokowej 22 kW), niezbędnym okablowaniem i osprzętem, - pompy ciepła (powietrze-woda) o mocy 83,4 kW. Panele PV wykorzystują zjawisko fotowolt. do przetwarzania promieniowania na en. elektr. Za pomocą połączeń kablowych przekazują one energię do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny, inst. będzie podłączona do sieci, Wyprodukowana energia będzie wykorzystywana na potrzeby własne a ewentualna nadwyżka będzie wprowadzona do sieci. Pompa ciepła działa na zasadzie transportu ciepła, umożliwia wykorzystanie ciepła o niskiej temp. do wytw. ciepła o wyższej temp.,które można zastosować do przygotowania ciepłej wody użytkowej. Pompa ciepła do swej pracy potrzebuje jedynie en. elektr., która jest przez nią wykorzyst. b. efektywnie. Eliminuje to konieczność podłączania do bud. objętego inwest. inst.gaz. czy innego źródła paliwa stałego czy ciekłego. W związku z tym, jest to inwest. ekolog., bezpieczna i oszczędna. Pompa ciepła planowana do inst. wymaga wykonania odwiertów. Wnioskodawca złożył do odpowiedniej instytucji wniosek o zatwierdzenie projektu robót geologicznych. Projekt zostanie zakończony w ciągu 1 roku od podpisania um. o dofinansowanie. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP oraz wpisuje się w założenia określone w SzOOP RPO WiM Osi Priorytetowej IV Efektywności energetycznej zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu polegający na budowie,rozbudowie oraz przebudowie infrastruktury mające na celu produkcję energii elektrycznej lub cieplnej z odnawialnych źródeł energii. (Polish)
    0 references
    The investment consists of the purchase and assembly in Olecko, plot number 3263, area 0002 Olecko: — roof photovoltaic installation-172 panels (polycrystalline with a unit power of 290 W) with a power of 49.88 kW with 2 inverters with a total power of 44 kW (with a single-steel power of 22 kW), necessary wiring and accessories, – heat pumps (air-water) with a power of 83.4 kW. PV panels use the phenomenon of photovolts. to convert radiation to en. electr. By means of cable connections, they transfer energy to inverters, where there is a change of DC into alternating current, the inst. will be connected to the grid, the generated energy will be used for own use and any surplus will be fed into the grid. The heat pump operates on the principle of heat transfer, allows the use of low-temperature heat for heat output at a higher temperature, which can be used for the preparation of hot domestic water. For its work, the heat pump only needs electr. en., which is used by it. b. effectively. This eliminates the need to connect to the construction site covered by the investment inst.gaz. or any other source of solid or liquid fuel. Therefore, it is an eco-investment, safe and economical. The heat pump planned for inst. requires drilling. The applicant has submitted an application to the relevant authority for approval of the geological works project. The project will be completed within 1 year of signing the grant agreement. The project meets all the shore conditions laid down in the SzOOP and is in line with the assumptions set out in the SzOOP ROP WiM of Priority Axis IV Energy Efficiency, the increased share of renewable energy sources in the overall energy balance of the region, consisting of the construction, expansion and reconstruction of infrastructure aimed at the production of electricity or heat from renewable energy sources. (English)
    8 July 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0268/18
    0 references