No label defined (Q3057629)

From EU Knowledge Graph
Revision as of 12:47, 15 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is the state regional road P32 Upper Līgatne – Skriveri section Upper Līgatne – Nītaure km 0.006-13.96, reconstruction works of the Strauta bridge, which include construction, construction supervision, author supervision and purchase of land. The total planned duration of the project is 39 months. The planned total cost of the project is EUR 9925090,44, including the planned European Regional Development Fund funding – EUR...)
Jump to navigation Jump to search
Project Q3057629 in Latvia
Language Label Description Also known as
English
No label defined
Project Q3057629 in Latvia

    Statements

    0 references
    0 references
    0 references
    8,436,326.88 Euro
    0 references
    9,925,090.44 Euro
    0 references
    1 June 2016
    0 references
    31 August 2019
    0 references
    Satiksmes ministrija
    0 references
    0 references

    57°18'3.46"N, 25°14'41.57"E
    0 references

    57°4'13.33"N, 25°3'11.20"E
    0 references
    Projekta mērķis ir valsts reģionālā autoceļa P32 Augšlīgatne – Skrīveri posma Augšlīgatne - Nītaure km 0,006 – 13,96, Strautas tilta pārbūves darbi, kas ietver segas izbūvi, būvuzraudzību, autoruzraudzību un zemju iegādi. Plānotais kopējais projekta īstenošanas ilgums 39 mēneši. Projekta plānotās kopējās izmaksas 9 925 090,44 euro, t.sk. plānotais Eiropas Reģionālās attīstības fonda finansējums – 8 436 326,88 euro un valsts budžeta finansējums – 1 488 763,56 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts reģionālā autoceļa P32 Augšlīgatne – Skrīveri posma Augšlīgatne - Nītaure km 0,006 – 13,96, ieskaitot Strautas tiltu – 13,954 km garumā. Projektā ietvertā autoceļa posmu maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. Autoceļš atrodas valsts īpašumā. Nepieciešamības gadījumā vajadzīgie zemes gabali tiks iegādāti. (Latvian)
    0 references
    The aim of the project is the state regional road P32 Upper Līgatne – Skriveri section Upper Līgatne – Nītaure km 0.006-13.96, reconstruction works of the Strauta bridge, which include construction, construction supervision, author supervision and purchase of land. The total planned duration of the project is 39 months. The planned total cost of the project is EUR 9925090,44, including the planned European Regional Development Fund funding – EUR 8436326.88 and the state budget funding – EUR 1488763.56. As a result of the project, the state regional road P32 Upper Līgatne – Skrīveri section Upper Līgatne – Nītaure km 0.006-13.96, including Strauta bridge – 13.954 km will be arranged. The maximum driven axle load of road sections covered by the project will be 11.5 tonnes after the implementation of the project and the maximum uncontrolled vehicle mass will be 44 tonnes. The road is state-owned. If necessary, the necessary plots will be purchased. (English)
    15 July 2021
    0 references
    Līgatnes pag., Cēsu nov.
    0 references
    Nītaures pag., Cēsu nov.
    0 references
    Mores pag., Siguldas nov.
    0 references
    Līgatnes pag., Cēsu nov.
    0 references
    Mores pag., Siguldas nov.
    0 references
    Mores pag., Siguldas nov.
    0 references

    Identifiers

    6.3.1.0/16/I/006
    0 references