INVESTMENTS IN WASTEWATER SANITATION INFRASTRUCTURE FOR THE RESOLUTION OF INADEQUATE TREATMENT SITUATIONS IN LOW-DENSITY TERRITORIES.- IMPLEMENTATION SAR PEBBLE OF MANHOSES III (Q2982595)

From EU Knowledge Graph
Revision as of 02:08, 9 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The execution of the Manhoses Seyxo treatment plant will gravitically drain the tributaries of 30 % of the population of Seixo de Manhosses. There is currently no treatment for this waste water. This sewage treatment plant aims to satisfactorily treat part of the urban waste water of Seixo de Manhoses, providing it with a satisfactory system of waste water treatment, thus producing environmental and social added value., translated_summary)
Jump to navigation Jump to search
Project Q2982595 in Portugal
Language Label Description Also known as
English
INVESTMENTS IN WASTEWATER SANITATION INFRASTRUCTURE FOR THE RESOLUTION OF INADEQUATE TREATMENT SITUATIONS IN LOW-DENSITY TERRITORIES.- IMPLEMENTATION SAR PEBBLE OF MANHOSES III
Project Q2982595 in Portugal

    Statements

    0 references
    109,390.05 Euro
    0 references
    85.0 percent
    0 references
    1 November 2017
    0 references
    31 March 2019
    0 references
    MUNICÍPIO DE VILA FLOR
    0 references
    0 references

    41°15'59.51"N, 7°10'55.24"W
    0 references
    A Execução da ETAR de Seixo de Manhoses III drenará graviticamente os afluentes de 30 % da população de Seixo de Manhosses. Actualmente não existe tratamento para estas águas residuais. Esta ETAR tem como grande objectivo tratar satisfatoriamente parte das águas residuais urbanas de Seixo de Manhoses, dotando a mesma de um sistema satisfatório de tratamento de águas residuais, produzindo-se assim uma mais-valia ambiental e social. (Portuguese)
    0 references
    The execution of the Manhoses Seyxo treatment plant will gravitically drain the tributaries of 30 % of the population of Seixo de Manhosses. There is currently no treatment for this waste water. This sewage treatment plant aims to satisfactorily treat part of the urban waste water of Seixo de Manhoses, providing it with a satisfactory system of waste water treatment, thus producing environmental and social added value. (English)
    9 July 2021
    0 references
    Vila Flor, Seixo de Manhoses
    0 references

    Identifiers

    POSEUR-03-2012-FC-000854
    0 references