Completion of the Residual Water Drainage Subsystem of Mezio Alguidar (Q2982273)

From EU Knowledge Graph
Revision as of 01:57, 9 July 2021 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem., remove_old_english_translation)
Jump to navigation Jump to search
Project Q2982273 in Portugal
Language Label Description Also known as
English
Completion of the Residual Water Drainage Subsystem of Mezio Alguidar
Project Q2982273 in Portugal

    Statements

    0 references
    779,237.44 Euro
    0 references
    85.0 percent
    0 references
    10 August 2016
    0 references
    30 September 2020
    0 references
    MUNICÍPIO DE LOUSADA
    0 references
    0 references

    41°16'38.57"N, 8°16'57.47"W
    0 references
    A presente operação contempla a instalação das redes em “baixa” necessárias para concluir o Subsistema do Mezio, bem como o estudo geológico e o levantamento topográfico necessários para o respetivo projeto. Prevê-se também a instalação dos Intercetores em “alta” que permitem fechar este subsistema. (Portuguese)
    0 references
    Lousada
    0 references

    Identifiers

    POSEUR-03-2012-FC-000380
    0 references