No label defined (Q2705786)

From EU Knowledge Graph
Revision as of 20:16, 7 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Main objective: Improving the quality of the natural environment in the municipality of Adamów, increasing the quality of life of the local community and increasing the competitiveness of the area. Objectives detail: 1. Reduction of pollutant emissions to air thanks to installation.inst. RES in the house and the construction of.pub. 2. Raises the quality of life of the inhabitant as a result of a stack of alternative energy sources, 3. Reduce th...)
Jump to navigation Jump to search
Project Q2705786 in Poland
Language Label Description Also known as
English
No label defined
Project Q2705786 in Poland

    Statements

    0 references
    1,348,200.0 zloty
    0 references
    299,704.86 Euro
    0.2223 Euro
    0 references
    2,140,000.0 zloty
    0 references
    475,722.0 Euro
    0.2223 Euro
    0 references
    63.0 percent
    0 references
    28 August 2019
    0 references
    15 December 2021
    0 references
    GMINA ADAMÓW
    0 references
    0 references

    51°44'37.3"N, 22°15'44.6"E
    0 references
    Cel główny: Poprawa jakości środowiska naturalnego na terenie Gminy Adamów wpływająca na wzrost jakości życia społ. lokalnej oraz zwiększenie konkurencyjności obszaru. Cele szczegół.: 1. Redukcja emisji zanieczyszczeń do powietrza dzięki montaż.inst. OZE w gospod. dom.oraz bud.użyt.pub. 2. Podnies. jakości życia mieszk. gm. w efekcie stos. alternatywnych źródeł energii, 3. Zmniejsz. obciążeń budżetów gospod. dom. oraz budż.gm Realiz. w OSI: nowoczesna wieś; kategoria interwencji 010: Energia słoneczna; Grupy docelowa: mieszkańcy Gminy Adamów oraz użyt. budynku UG; realiz. w budynkach prywat.i użyt.publ. Zakres proj. obej. montaż 208szt. kolektorów słonecznych- zestawy o łącznej mocy 0,81 MW (2panele 3kW-81 szt i 3 panele -4,5kW-127 szt) oraz 1inst.fotowolt. o mocy0,0032 MW (budynek UG w Adamowie). Łączna moc zainstalowanych OZE- 0,81 MW. Rezultaty:Szacow. roczny spadek emisji gazów ciepl.315,82tCO2/rok; Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE 878,0MWht/rok; Produkcja energii elektr. z nowo wybudowanych instalacji wykorzystujących OZE 3,07 MWhe/rok Dodatk. zdolność wytwarzania energii cieplnej z OZE-0,81MWt. Dodatk. zdolność wytwarzania energii elektrycznej z OZE-0,0032MWe. Instalacje wyposażone w technologie TIK- umożliwią zarządzanie energią (pomiar, obsługę i monitoring wykorzyst. energii). Utworzona zostanie strona internet. z funkcjonalnościami on-line (transakcje, skargi i wnioski, usterki) oraz promocją rozwiąz. czystej energii. Obiekty w m.Adamów obj.ochrona konserw.z MPZP. Pozostałe nie obj.ochroną konserwatorską (rejestry, ewidencje, MPZP). Proj. zgodny z POP dla strefy lub. Przeciwdziała ubóstwu energetycznemu -likwiduje bariery w dostępie do OZE;- dywersyfikuje źródła energii; -podnosi jakość i komfort życia mieszk.,-generuje oszczęd. w budżet. dom.ZAD. KWALIFIKOWALNE- montaże zestawów solarnych i zest.fotowolt.+ strona/TIK; ZADANIA NIEKWALIFIKOWALNE- 2-ga wężownica, SW,Nadzór inwest.,Promocja proj., podatek VAT. (Polish)
    0 references
    Main objective: Improving the quality of the natural environment in the municipality of Adamów, increasing the quality of life of the local community and increasing the competitiveness of the area. Objectives detail: 1. Reduction of pollutant emissions to air thanks to installation.inst. RES in the house and the construction of.pub. 2. Raises the quality of life of the inhabitant as a result of a stack of alternative energy sources, 3. Reduce the burden of house budgets and budgets.gm Realiz. in OSI: modern village; intervention category 010: Solar energy; Target groups: residents of the Municipality of Adamów and the use of the UG building; realised. in buildings prywat.i ut.publ. The projection range includes the installation of 208 pcs of solar collectors – sets with a total power of 0.81 MW (2 panels 3 kW-81 pcs and 3 panels – 4.5 kW-127 pcs) and 1inst.photovolt. with a power of0,0032 MW (UG building in Adamów). Total installed RES capacity – 0.81 MW. Rezultaty:Szacow annual decrease in heat gas emissions.315,82tCO2/year; Heat production from newly built installations using RES 878,0MWht/year; Production of electr. from newly built installations using RES 3.07 MWhe/year Additional capacity to generate thermal energy from RES-0.81MWt. Additional capacity to generate electricity from RES-0.0032MWe. Installations equipped with ICT technologies – will enable energy management (measurement, operation and monitoring of the use of energy). A website will be created. with on-line functionalities (transactions, complaints and requests, faults) and promotion of the solution of clean energy. Objects in the Adams area of conservation protection with MPZP. Others are not covered by conservation protection (registers, records, MPZPs). Projection compatible with POP for zone or. Combats energy poverty – removes barriers to access to RES; – diversifys energy sources; —increases the quality and comfort of living the bellows.,-generates saving. in the budget. home.ZAD. Qualificial – installation of solar sets and zest.photovolt.+ page/TIK; Non-QUIFICAL quests – 2nd coil, SW,Investment supervision.,Promotion of design, VAT. (English)
    7 July 2021
    0 references

    Identifiers

    RPLU.04.01.00-06-0073/19
    0 references