Introduction of an innovative vacuum drainage service with high pressure Upstream technology using high speed mostupdays and evidence-based filters based on the results of R & D (Q118320)

From EU Knowledge Graph
Revision as of 08:37, 10 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): As a result of the project, an innovative sub-pressurised water drainage service using an advanced needle-fitting technology and based on the results of R & D performed by the applicant will be introduced into the firm’s bid. The project consists of the purchase of three fixed assets, such as: a crawler excavator, vibrating hammer and the filter aggregate in a sound-absorbent housing with an installation. The service will be innovative on a glob...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Introduction of an innovative vacuum drainage service with high pressure Upstream technology using high speed mostupdays and evidence-based filters based on the results of R & D
Project in Poland financed by DG Regio

    Statements

    0 references
    1,025,375.0 zloty
    0 references
    246,090.0 Euro
    13 January 2020
    0 references
    1,947,797.25 zloty
    0 references
    467,471.33999999997 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 March 2017
    0 references
    30 June 2017
    0 references
    PRZEDSIĘBIORSTWO PRODUKCYJNO-USŁUGOWO-HANDLOWE "ARBUD" ARTUR CZAPKA
    0 references
    W wyniku realizacji projektu do oferty firmy wprowadzona zostanie innowacyjna usługa odwadniania głębokich wykopów metodą podciśnieniową z wykorzystaniem zaawansowanej technologii montażu igłostudni i igłofiltrów opartej na wynikach prac B+R przeprowadzonych przez wnioskodawcę. Projekt polega na zakupie trzech środków trwałych takich jak: koparka gąsienicowa, młot wibracyjny oraz agregat głofiltrowy w obudowie dźwiękochłonnej wraz z instalacją. Wprowadzona usługa cechować się będzie innowacyjnością w skali światowej. (Polish)
    0 references
    As a result of the project, an innovative sub-pressurised water drainage service using an advanced needle-fitting technology and based on the results of R & D performed by the applicant will be introduced into the firm’s bid. The project consists of the purchase of three fixed assets, such as: a crawler excavator, vibrating hammer and the filter aggregate in a sound-absorbent housing with an installation. The service will be innovative on a global scale. (English)
    0 references

    Identifiers

    RPPK.01.04.01-18-0546/16
    0 references