River Danube River Regime for Sotina from 1321 rkm to 1325 rkm (Q2734688)

From EU Knowledge Graph
Revision as of 14:30, 21 June 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q2734688 in Croatia
Language Label Description Also known as
English
River Danube River Regime for Sotina from 1321 rkm to 1325 rkm
Project Q2734688 in Croatia

    Statements

    0 references
    37,058,261.77 Croatian kuna
    0 references
    4,817,574.03 Euro
    2 June 2021
    0 references
    43,597,955.03 Croatian kuna
    0 references
    5,667,734.15 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    1 October 2020
    0 references
    31 December 2023
    0 references
    Ministarstvo mora, prometa i infrastrukture
    0 references
    0 references
    0 references

    45°50'5.46"N, 15°58'14.74"E
    0 references
    10000
    0 references
    Projekt se nalazi u RH, Vukovarsko-srijemska županija, naselje Sotin, a odnosi se na uređenje vodnog puta na rijeci Dunav od 1321 do 1325 rkm.Cilj projekta je povećanje stupnja sigurnosti plovidbe na predmetnoj dionici rijeke Dunav putem izgradnje tri vodne građevine, 2 tzv. “pera” i 1 “uzdužne građevine”. Ujedno, projektom će se umanjiti negativni morfološki trendovi na desnoj obali ove dionice Dunava, konkretno proces erozije na približno 1322 rkm. kod mjesta Sotin gdje ti procesi imaju direktan utjecaj na urušavanje obale te širenje riječnog korita čime se smanjuje dubina plovnog puta.Ukupna vrijednost prihvatljivih troškova projekta iznosi 43.597.955,03 HRK.Ukupni troškovi Projekta sadrže i PDV kao prihvatljiv trošak. (Croatian)
    0 references
    The project is located in Croatia, Vukovar-Srijem County, Soentin settlement, relating to the river basin management in the Danube River from 1321 to 1325. the project aims to increase the degree of safety of navigation on the stretch concerned by the Danube River in the form of the construction of three water buildings, 2 so called ‘pen nibs’ and 1 ‘longitudinal buildings’. At the same time, the project will reduce negative morphological trends on the right coast of this section of Danube, namely the erosion of approximately 1322 k.m. at Sotin sites where these processes have a direct effect on the collapse of the coast and the expansion of the river bed, reducing the depth of the craft. the total cost of the Project is also included in VAT as an eligible cost. (English)
    3 June 2021
    0 references

    Identifiers

    KK.07.3.1.04.0001
    0 references