Energy efficiency project for the Primary School, Vladimir Nazora, Vinolska 12, Crikvenica (Q2733416)

From EU Knowledge Graph
Revision as of 12:59, 3 June 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): A basic school, Vladimir Nazora, is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, the replacement of the joinery and flat roof, leadi...)
Jump to navigation Jump to search
Project Q2733416 in Croatia
Language Label Description Also known as
English
Energy efficiency project for the Primary School, Vladimir Nazora, Vinolska 12, Crikvenica
Project Q2733416 in Croatia

    Statements

    0 references
    2,204,127.06 Croatian kuna
    0 references
    286,536.52 Euro
    2 June 2021
    0 references
    10,758,615.03 Croatian kuna
    0 references
    1,398,619.95 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    12 April 2019
    0 references
    12 April 2021
    0 references
    GRAD CRIKVENICA
    0 references

    45°10'24.89"N, 14°41'29.44"E
    0 references
    51260
    0 references
    Osnovna škola Vladimira Nazora smještena je u objektu neadekvatnih konstrukcijskih elemenata u smislu energetske učinkovitosti. Rekonstrukcijom objekta za potrebe škole pridonijet će se poboljšanju uvjeta boravka djece te smanjenju troškova poslovanja. Na objektu se planira provesti mjera toplinske izolacije na vanjske zidove, zamjena stolarije i ravnog krova čime će se postići značajne uštede u potrošnji energije Qh,nd 46.463,74 kWh/a (77,85 %) odnosno sam cilj ovog projekta - povećanje energetske učinkovitosti zgrade. (Croatian)
    0 references
    A basic school, Vladimir Nazora, is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, the replacement of the joinery and flat roof, leading to significant savings in the energy consumption Qh, nd 46 463.74 kWh/a (77.85 %) and the very objective of this project, namely to increase the energy performance of the building. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0760
    0 references