No label defined (Q2717257)

From EU Knowledge Graph
Revision as of 01:54, 8 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project consists of the purchase and assembly of photovoltaic panels, the location of the investment plot 251/2 area 0014 Dębówko. The 39,325 kWp installation is designed with 121325 W modules. SMART modules are designed with power optimisers. In combination with the inverter, they allow monitoring of the operation parameters of each module, this allows you to reduce the voltage of the installation on the DC side when the inverter is switche...)
Jump to navigation Jump to search
Project Q2717257 in Poland
Language Label Description Also known as
English
No label defined
Project Q2717257 in Poland

    Statements

    0 references
    178,670.0 zloty
    0 references
    39,718.34 Euro
    0.2223 Euro
    0 references
    210,200.0 zloty
    0 references
    46,727.46 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    3 October 2016
    0 references
    30 June 2020
    0 references
    DWOREK DĘBÓWKO JADWIGA JEŻEWICZ
    0 references
    0 references

    54°15'44.3"N, 20°48'32.0"E
    0 references
    Projekt polega na zakupie i montażu paneli fotowoltaicznych, lokalizacja inwestycji działka 251/2 obręb 0014 Dębówko. Projektowana jest instalacja o mocy 39,325 kWp zbudowana jest z 121 modułów o mocy 325 W. Projektowane są moduły typu SMART wyposażone w optymalizatory mocy. W połączeniu z inwerterem umożliwiają monitorowanie parametrów pracy każdego modułu, umożliwia to zmniejszenie wartości napięcia instalacji po stronie DC po wyłączeniu inwertera. - Optymalizatory mocy są przetwornikami DC/DC regulującymi napięcie układu. Urządzenia posiadają układ śledzący punkt mocy maksymalnej. Projektuje się zestaw złożony z 140 optymalizatorów mocy. Urządzenia mocować do szyn montażowych znajdujących się z tyłu panelu. - Inwerter jest urządzeniem elektroenergetycznym służącym do przekształcania prądu stałego uzyskanego z paneli fotowoltaicznych na prąd zmienny o parametrach sieci energetycznej, do której zostaje podłączony. Dodatkowo przy współpracy z modułami typu SMART pozwala na zmniejszenie wartości napięcia instalacji do poziomu bezpiecznego. Monitoring instalacji będzie zapewniony poprzez bezprzewodowe połączenie internetowe WIFI, zapewnione przez inwestora. Projektuje się dwa inwertery 3-fazowe. Projekt polega na instalacji paneli fotowoltaicznych wykorzystujących energię słońca- do 2 MWe/MWth - w związku z tym wpisuje się w SzOOP WiM na lata 2014-2020. Również poprzez zakładane efekty Projekt wpisuje się w założenia SzOOP, Osi 4 Efektywność energ.-Cel temat. 4 – Wspieranie przejścia na gosp .niskoemis.(..). Można to wyrazić wskaźnikami produktu i rezultatu (V sekcja w o dof). Etapy realizacji proj.: -prace przygotowawcze, -złożenie wniosku o dof., -podpisanie umowy o dofinansowanie, -wyłonienie wykonawcy zg. z zasadą konkurencyjności,promocja proj. -zawarcie umowy, -zakończenie prac i podpisanie prot. końcowego, -rozliczenie projektu. Sposób wdrażania zakr.rzeczow: -podpisanie umowy, -realizacja prac, -odbiór końcowy i podpisanie protokołu. (Polish)
    0 references
    The project consists of the purchase and assembly of photovoltaic panels, the location of the investment plot 251/2 area 0014 Dębówko. The 39,325 kWp installation is designed with 121325 W modules. SMART modules are designed with power optimisers. In combination with the inverter, they allow monitoring of the operation parameters of each module, this allows you to reduce the voltage of the installation on the DC side when the inverter is switched off. — Power optimisers are DC/DC converters regulating the system voltage. The devices shall have a system that tracks the maximum power point. A set of 140 power optimisers is designed. Attach the devices to the mounting rails located at the rear of the panel. — Inverter is an electrical device used to convert direct current obtained from photovoltaic panels into alternating current parameters of the power grid to which it is connected. In addition, in cooperation with SMART modules, it allows you to reduce the voltage of the installation to a safe level. Monitoring of the installation will be provided by wireless WIFI Internet connection, provided by the investor. Two 3-phase inverters are designed. The project consists of installing solar photovoltaic panels – up to 2 MWe/MWth – therefore fits into the SzOOP WiM 2014-2020. The project also fits into the assumptions of SzOOP, Axis 4 Energy Efficiency.-Objective Theme. 4 – Supporting the transition to gosp.niskoemis.(..). This can be expressed in output and result indicators (V section in o dof). Stages of project implementation: —preparatory work, -submission of an application for doc., -signing a grant agreement, -issuing the contractor according to the principle of competitiveness,promotion of the project. —conclusion of the contract, -completing the work and signing of the final proposal, -settling of the project. The way in which the goods are implemented: —signing the agreement, -implementation of the work, -final reception and signing of the protocol. (English)
    8 July 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0232/17
    0 references