Thermal modernisation of Primary School No 5 in Napomarów (Q114879)

From EU Knowledge Graph
Revision as of 08:13, 10 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project comprises 1 investment tasks, which are being carried out on an existing building. The object of the project will be the deep energy renovation of the basic Nr5 Primary School Building in Napomyak. This work comprises: modernisation of the internal installation of heating equipment, the insulation of the roof of the enclosure, the insulation of the roof of the ground floor and the insulation of the roof of the ground floor and the im...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of Primary School No 5 in Napomarów
Project in Poland financed by DG Regio

    Statements

    0 references
    499,840.11 zloty
    0 references
    119,961.6264 Euro
    13 January 2020
    0 references
    789,204.65 zloty
    0 references
    189,409.116 Euro
    13 January 2020
    0 references
    81.64 percent
    0 references
    4 May 2018
    0 references
    30 November 2018
    0 references
    GMINA NAMYSŁÓW
    0 references
    Projekt obejmuje 1 zadanie inwestycyjne, realizowane na istniejącym budynku. Przedmiotem projektu będzie głęboka modernizacja energetyczna budynku Szkoły Podstawowej Nr5 w Namysłowie. Zakres prac obejmuje: modernizację instalacji wewnętrznej c.o., docieplenie dachu dobudowanych pomieszczeń poddasza, docieplenie stropu tarasu, docieplenie ścian zewnętrznych parteru i wykonanie zielonej ściany poprzez obsadzenie ściany zachodniej pnączami samoczepnymi, I piętra i poddasza, docieplenie dachów lukarn krytych papą, docieplenie ścian zewnętrznych parteru pod tarasem, docieplenie stropu nad poddaszem, docieplenie ścian zewnętrznych piwnicy, wykonanie instalacji wentylacji nawiewno-wywiewnej mechanicznej z odzyskiem ciepła, docieplenie dachu istniejących pomieszczeń poddasza, wymiana okien zewnętrznych PCV, docieplenie ścian zewnętrznych przy gruncie, docieplenie podłogi na gruncie piwnicy, modernizacja instalacji c.w.u. poprzez zamontowanie dodatkowego zestawu solarnego(OZE) w oparciu o podgrzewacz biwalentny z wykonaniem rozprowadzeń c.w.u. do pkt poboru, wymiana istniejących drzwi zewnętrznych wejściowych, wymiana źródeł światła i opraw oświetleniowych na energooszczędne-LED. Należy podkreślić, że wszystkie prace wynikają z audytów energetycznych sporządzonych przez osoby posiadające wymagane kwalifikacje (tj. Panowie J. Janeczek, J. Nowak i Andrzej Turowicz). Raport z przeprowadzonego audytu został sporządzony w dn.2017-01-17 i stanowi załącznik do dokumentacji aplikacyjnej. Realizacja projektu planowana jest na ok.6 miesięcy w 2018r. Projekt nie jest przedsięwzięciem partnerskim. Zakres planowanych prac jest spójny z audytami energetycznymi oraz projektem budowlanym. Produkty, jakie powstaną dzięki realizacji projektu to:1 zmodernizowany energetycznie budynek, 1 wybudowana jednostka wytwarzania energii cieplnej z OZE, 0,0054 MWt dodatkowej zdolności wytwarzania energii cieplnej ze źródeł odnawialnych, 751m2 powierzchni użytkowej budynków poddanych termomoder (Polish)
    0 references
    The project comprises 1 investment tasks, which are being carried out on an existing building. The object of the project will be the deep energy renovation of the basic Nr5 Primary School Building in Napomyak. This work comprises: modernisation of the internal installation of heating equipment, the insulation of the roof of the enclosure, the insulation of the roof of the ground floor and the insulation of the roof of the ground floor and the implementation of the green wall by filling the wall of the ground floor wall and the wall, insulation of the roof of the ground floor under the terrace, insulation of the outer wall of the basement, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, heating of outdoor walls on the ground, retrofitting of existing external doors, replacement of existing external doors, replacement of light sources and luminaires on energy efficient LED. It should be stressed that all the work is the result of energy audits carried out by persons with the required qualifications (i.e.: Mr J. Janeczek, J. Nowak and Mr. Andrzej Turowicz). The audit report was drawn up in 2017-01-17 and is annexed to the application file. The project is planned for 6 months in 2018. The project is not a partnership. The scope of the planned work is consistent with energy audits and the construction project. The products to be produced by the project are 1 modernised energy building, 1 built unit of heat generation from RES, 0,0054 MWt of the additional renewable heat generation capacity, 751 m² of usable building surface of the buildings undergoing Thermomodem. (English)
    0 references

    Identifiers

    RPOP.03.02.01-16-0024/17
    0 references