Renovation and renovation of the building after the former primary school in msc. Cyganka, with associated infrastructure and small architecture components. (Q105400)

From EU Knowledge Graph
Revision as of 10:16, 6 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The main objective of the project is to improve the energy efficiency of the building after the former primary school in m. The inhabitants of the village of Cyganka, in the facility after the former primary school, have created, partly by their own forces and resources, the rural community. There has been a new centre of meetings between the people of the population, where meetings of the inhabitants are organised, generational integration, the...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation and renovation of the building after the former primary school in msc. Cyganka, with associated infrastructure and small architecture components.
Project in Poland financed by DG Regio

    Statements

    0 references
    391,810.93 zloty
    0 references
    94,034.6232 Euro
    13 January 2020
    0 references
    883,278.0 zloty
    0 references
    211,986.72 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 July 2017
    0 references
    30 June 2021
    0 references
    GMINA MILEJÓW
    0 references
    Celem głównym projektu jest poprawa efektywności energetycznej w budynku po byłej szkole podstawowej w m. Cyganka. Mieszkańcy wsi Cyganka, w obiekcie po byłej szkole podstawowej stworzyli, częściowo własnymi siłami i środkami, świetlicę wiejską. Świetlica na nowo stała się miejscem spotkań mieszkańców gdzie organizowane są zebrania sołeckie, integracja pokoleniowa, wymiana doświadczeń osób starszych i młodszych. W pomieszczeniach znajdują się stoły do ping-ponga oraz szachy gdzie młodzież ma możliwość aktywnie i ciekawie spędzać wolny czas. W ramach projektu zaplanowano: modernizację instalacji c.o., wymianę okien i modernizację wentylacji, ocieplenie ścian, modernizację c.o., ocieplenie stropu, ocieplenie podłogi na gruncie. Do realizacji zaplanowano także montaż instalacji fotowoltaicznej składającej się paneli fotowoltaicznych wykonanych w technologii monokrystalicznych o mocy do 5 kWp przymocowanej do połaci dachowej od strony południowej oraz montaż pompy ciepła mocy powietrze-woda wraz z podgrzewaczem pojemnościowym o poj. 110 dm3, moc cieplna pompy 1500W. Dokładny opis kosztów z podziałem na wydatki KW i NKW umieszczony został w piśmie przewodnim ze względu na ograniczoną liczbę znaków. Kluczowe rezultaty projektu wyrażone wskaźnikami rezultatu to:1.Ilość zaoszczędzonej energii cieplnej[GJ/rok: 177,23]2.Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych [kWh/rok: 126058,34]3.Szacowany roczny spadek emisji gazów cieplarnianych[tony równoważnika CO2/rok: 33,43]4.Produkcja energii elektrycznej z nowo wybudowanych mocy wytwórczych instalacji wykorzystujących OZE[MWhe/rok: 5,248]5.Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE[MWht/rok: 5,248]. Ilość zaoszczędzonej energii elektrycznej 37,84 MwH/rok, Dod. zdolność wyt. ener. ele.0,005 MWe W wyniku realizacji projektu nastąpi zwiększenie efektywności energetycznej budynku o 78,47%. Grupą docelową projektu są mieszkańcy Gminy Milejów. (Polish)
    0 references
    The main objective of the project is to improve the energy efficiency of the building after the former primary school in m. The inhabitants of the village of Cyganka, in the facility after the former primary school, have created, partly by their own forces and resources, the rural community. There has been a new centre of meetings between the people of the population, where meetings of the inhabitants are organised, generational integration, the exchange of experience of older and younger people are organised. The rooms offer an opportunity to spend their feet and take an active and interesting opportunity to spend their leisure time. The project is designed to: modernisation of the heating system, replacement of windows and modernisation of ventilation, insulation of walls, modernisation of c.o, warming of the ceiling, insulation of the floor on the ground. It is also planned to install a photovoltaic installation consisting of mono-crystalline photovoltaic panels of up to 5 kWp attached to the roof roof from the south and installation of an air-water heat pump with a capacity heater. 110 dm³, heat output of pump 1500W. The exact description of the costs, broken down by the expenditure of the TA and the SP, is included in the cover note due to the limited number of characters. Key project deliverables expressed as result of to:1.Ilość saved heat energy [GJ/year: 177,23] 2.Reduction of annual primary energy consumption in public buildings [kWh/year: 126058,34] 3.Estimated annual decrease in greenhouse gas emissions [tonnes of equivalent CO2/rok: 33,43] 4.Production of electricity from newly constructed RES installations [MWhe/year: 5,248] 5.Production of electricity from newly built/new generation capacity of installations using RES [MWHT/year: 5,248]. An amount of saved electricity of 37.84 MWh/year adding. E.0,005 MWe. the project will result in a 78.47 % increase in the energy efficiency of the building. The target group of the project is the inhabitants of the Municipality of Milleów. (English)
    0 references

    Identifiers

    RPLU.05.02.00-06-0081/17
    0 references