Clean energy for Ljubljana (Q104818)

From EU Knowledge Graph
Revision as of 09:27, 9 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Goal: Increasing the use of clean energy technologies by people through the installation of renewable energy sources in the city. The project will improve the energy security of the municipality and contribute directly to the reduction of air pollution. The investment will reduce the financial burden on residents and will improve the municipality’s attractiveness. Results: Additional renewable energy capacity (total) — 2.1741 MW; Energy producti...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Clean energy for Ljubljana
Project in Poland financed by DG Regio

    Statements

    0 references
    4,294,365.51 zloty
    0 references
    1,030,647.7223999999 Euro
    13 January 2020
    0 references
    5,420,089.25 zloty
    0 references
    1,300,821.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    25 April 2016
    0 references
    31 December 2018
    0 references
    GMINA MIASTO LUBARTÓW
    0 references
    Cel główny: Wzrost wykorzystania technologii wytwarzania czystej energii przez mieszkańców poprzez montaż odnawialnych źródeł energii na terenie miasta. Projekt wpłynie na poprawę bezpieczeństwa energetycznego gminy oraz przyczyni się bezpośrednio do redukcji zanieczyszczenia powietrza. Inwestycja wpłynie na zmniejszenie obciążeń finansowych mieszkańców oraz podniesie atrakcyjność gminy. Rezultaty: Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych (razem) - 2,1741 MW; Produkcja energ. z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE:cieplnej - 1374,01MWht/rok, elektr. - 503,97MWhe/rok. Szacowany roczny spadek emisji gazów cieplarnianych (CI34) 1145,11 tony równoważnika CO2/rok;Liczba wybudowanych jednostek wytwarzania energii cieplej z OZE 220 szt., w tym: - 135 instalacji:2 kol. słoneczne o mocy 1637 W; - 45 instalacji:3 kol. słoneczne o mocy 1637 W; Łącznie kolektory:0,66299 MW - 40 instalacji kotłów na biomasę o mocy 25 kW - łącznie 1 MW. Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE 142 szt., w tym: - 30 instalacji o mocy 2,44 kWp -8 modułów - 0,305 kW, - 78 instalacji o mocy 3,355 kWp -11 modułów - 0,305 kW, - 34 instalacji o mocy 5,185 kWp -17 modułów - 0,305 kW; Łącznie instalacje:0,51118MW-PV. Grupy docelowe: - interesariusze główni: Gmina Miasta Lubartowa oraz mieszkańcy - użytkownicy instalacji OZE; - interesariusze drugorzędni - ,pozostali mieszkańcy miasta i regionu; - interesariusze kontekstowi - IZ RPO WL. Inwestycja jest zgodna z dokumentami wykazanymi w pkt. 2.11, z zapisami PGN dla Miasta Lubartów. W POP dla Strefy Lubelskiej zapisano "(…) Biorąc pod uwagę wyniki modelowania jakości powietrza, jako obszar występowania przekroczeń normatywnych stężeń PM10 w powietrzu zidentyfikowano: gminy: Kraśnik, Lubartów (…). I dalej (…) Z analiz udziału poszczególnych źródeł emisji w stężeniach ponadnormatywnych dla pyłu PM10 wynika konieczność redukcji emisji z obszarów: … Lubartów(...)". (Polish)
    0 references
    Goal: Increasing the use of clean energy technologies by people through the installation of renewable energy sources in the city. The project will improve the energy security of the municipality and contribute directly to the reduction of air pollution. The investment will reduce the financial burden on residents and will improve the municipality’s attractiveness. Results: Additional renewable energy capacity (total) — 2.1741 MW; Energy production from newly built/new generation capacity of RES installations: thermal — 1374,01MWt/year, electricity 503,97MWhe/year. Estimated annual decrease in greenhouse gas emissions (CI34) of 1145,11 tonnes CO2/rok of greenhouse gases, Number of plants to be built from renewable energy from RES 220, including: — 135 installations: 2 colds with a capacity of 1637 W; — 45 installations: 3 colds with a capacity of 1637 W; Total kolektory:0,66299 MW — 40 biomass boiler installation 25 kW — total 1 MW. Number of 142 RES electricity generation units built, including: — 30 units of 2,44 kWp — 8 modules — 0.305 kW, — 78 units 3,355 kWp -11 modules — 0.305 kW, — 34 installations with a power of 5,185 kWp -17 modules — 0.305 kW; Total instalacje:0,51118MW-PV. The target groups: — Main stakeholders: Municipality of Lubartowa Town Council and inhabitants — users of RES installations; Secondary stakeholders — the remaining inhabitants of the city and region; Context — MA ROP WL. The investment shall be in accordance with the documents indicated in point. 2.11, with the provisions of the PGN for the City of Lubartów. In the POP for the Lublin Zone, "(...) Given the results of air quality modelling as an area of exceedance of the regulatory PM10 concentrations in the air, the following were identified: municipalities: Krasnik, Lubartów (...). The analysis of the contribution of specific emission sources in concentrations above the standard for PM10 results in a reduction in emissions from the following areas: ... Lubartów (...)”. (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0282/16
    0 references