THERMAL MODERNISATION OF THE OFFICE OF THE MUNICIPALITY OF ZGIERZ (Q101893)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | THERMAL MODERNISATION OF THE OFFICE OF THE MUNICIPALITY OF ZGIERZ |
Project in Poland financed by DG Regio |
Statements
459,616.55 zloty
0 references
882,652.53 zloty
0 references
85.0 percent
0 references
22 December 2017
0 references
30 December 2018
0 references
GMINA ZGIERZ
0 references
PRZEDMIOT. PROJEKT OBEJMUJE SWOIM ZAKRESEM PRACE TERMOMODERNIZACYJNE W BUDYNKU URZĘDU GMINY W ZGIERZU. BUDYNEK ZLOKALIZOWANY JEST W ZGIERZU WOJ. ŁÓDZKIE , UL. ŁĘCZYCKA 4, DZ. NR 258 J.E. 102003_1, OB. 0122. TEREN PŁASKI, ZABUDOWANY, POSIADA WEJŚCIE ORAZ WJAZD Z DZIAŁKI NR 202/2 (UL. ŁĘCZYCKA). OD STR. ZACH. GRANICZY Z DZ. DROGOWĄ NR 202/2 (UL. ŁĘCZYCKA), OD STR. PÓŁN. Z DZ. O NR 256, OD STRONY WSCH. I POŁD. Z DZ. O NR 260/1. PROJEKT ZOSTAŁ WYBRANY W TRYBIE POZAKONKURSOWYM O STRATEGICZNYM ZNACZENIU DLA SPOŁECZNO-GOSPODARCZEGO OBSZARU ZIT. WSKAZANY W STRATEGII ŁÓDZKIEGO OBSZARU METROPOLITALNEGO 2020+. ZADANIA. PROJEKTEM OBJĘTO DOCIEPLENIE BUDYNKU (POW. UŻ. 789,80 M2) WRAZ Z OTYNKOWANIEM, INSTALACJĘ WENTYLACJI MECHANICZNEJ, WYMINĘ RYNIEN I RUR SPUSTOWYCH, ORAZ WYMIANĘ CZĘŚCI INSTALACJI ELEKTRYCZNEJ OŚWIETLENIA I WYMIANĘ PUNKTÓW OŚWIETLENIOWYCH, WYMIANĘ CZĘŚCI OKIEN WRAZ Z PARAPETAMI WEWNĘTRZNYMI, A TAKŻE WSZYSTKICH PARAPETÓW ZEWNĘTRZNYCH, MONTAŻ OCIEPLENIA KLATKI SCHODOWEJ NA STRYCH WRAZ Z OTYNKOWANIEM, ORAZ OCIEPLENIA STROPU NA STRYCHU, A TAKŻE MONTAŻ SUFITÓW PODWIESZANYCH W WYBRANYCH POMIESZCZENIACH I OBUDOWĘ NOWEJ INSTALACJI PŁYTĄ G-K WRAZ Z OTYNKOWANIEM. W RAMACH WYKONANIA INSTALACJI ELEKTRYCZNEJ W BUDYNKU, PROJEKT OBEJMUJE PRACE W ZAKRESIE: OŚWIETLENIA WBUDOWANEGO W CAŁYM BUDYNKU, MONTAŻU OŚWIETLENIA AWARYJNEGO I EWAKUACYJNEGO KIERUNKOWEGO W CAŁYM BUDYNKU, ZASILANIA URZĄDZEŃ INSTALACJI SANITARNYCH ORAZ INSTALACJĘ ODGROMOWĄ. INWESTYCJA OBEJMIE TAKŻE WYKONANIE WENTYLACJI MECHANICZNEJ DLA PROJEKTOWANEGO ZAMIERZENIA BUDOWLANEGO. CELEM PROJEKTU JEST POPRAWA EFEKTYWNOŚCI ENERGETYCZNEJ BUDYNKU POPRZEZ OCIEPLENIE BUDYNKU, WYMIANĘ OKIEN, ORAZ WYK. OŚWIETLENIA ENERGOOSZCZĘDNEGO. ZAKŁADA SIĘ ZWIĘKSZENIE EFEKTYWNOŚCI ENERGETYCZNEJ BUDYNKU POW. 25%, A ROCZNE ZMNIEJSZ. ZAPOTRZEBOWANIA NA ENERGIĘ WYNIESIE 68,65% GRUPY DOCELOWE: UŻYTKOWNIKAMI PROJEKTU BĘDĄ OSOBY KORZYSTAJĄCE Z TERMOMODERNIZOWANEGO OBIEKTU SEKTORA PUBLICZNEGO, W SZCZEGÓLNOŚCI MIESZKAŃCY GMINY ZGIERZ (Polish)
0 references
THE SUBJECT-MATTER. THE PROJECT COVERS THE WORK OF THERMO-MODERNISATION IN THE MUNICIPAL BUILDING OF THE TOWN HALL IN THE CITY OF ZGIERZE. THE BUILDING IS LOCATED IN ZGIERZ WOJ. ŁÓDZKIE, UL. ŁĘCZYCKA 4, DZ. NO 258 J.E. 102003_1, OB. 0122. A FLAT BUILT-UP AREA, ENTERED AND ENTERED FROM PLOT NO 202/2 (UL. ŁĘCZYCKA). FROM PAGE. ZACH. IT HAS YOUR BORDERS. ROAD NO 202/2 (UL. ŁĘCZYCKA), FROM STR. MR PÓŁN. Z DZ. O NO 256, FROM THE SIDE. AND POŁD. Z DZ. O NO 260/1. THE PROJECT WAS SELECTED IN A NON-COMPETITIVE PROCEDURE OF STRATEGIC IMPORTANCE FOR THE SOCIO-ECONOMIC AREA OF THE ITI AREA. IDENTIFIED IN THE STRATEGY OF THE ŁÓDZKIE METROPOLITAN AREA 2020 +. TASKS. THE PROJECT HAS BEEN EXTENDED TO COVER THE INSULATION OF THE BUILDING (POW. DO NOT. 789,80 M2) TOGETHER WITH OTYNKOWSKI, INSTALLATION OF MECHANICAL VENTILATION, GUTTERS AND DRAINS, AND REPLACEMENT OF PARTS OF THE ELECTRICAL LIGHTING SYSTEM AND REPLACEMENT OF LIGHTING POINTS, REPLACEMENT OF PART OF WINDOWS WITH INTERNAL PARAPEES AS WELL AS ALL EXTERNAL PARISHES, INSTALLATION OF STAIRWELLS OF THE STAIRCASE ALONG WITH OTYNKOWSKI, AND THE INSTALLATION OF SUSPENDED CEILINGS IN THE SELECTED ROOMS AND THE HOUSING OF THE NEW G-K APRON WITH OTYNKOWSKI. AS PART OF THE EXECUTION OF AN ELECTRICAL INSTALLATION IN A BUILDING, THE PROJECT INVOLVES WORK ON: LIGHTING BUILT THROUGHOUT THE BUILDING, INSTALLATION OF EMERGENCY LIGHTING AND EMERGENCY EVACUATION IN THE BUILDING AS A WHOLE, FEEDING THE SANITARY INSTALLATIONS AND LIGHTNING. THE INVESTMENT WILL ALSO COVER THE IMPLEMENTATION OF MECHANICAL VENTILATION FOR THE PLANNED CONSTRUCTION. THE AIM OF THE PROJECT IS TO IMPROVE THE ENERGY EFFICIENCY OF THE BUILDING THROUGH INSULATION OF THE BUILDING, REPLACEMENT OF WINDOWS, AND WYK. ENERGY-SAVING LIGHTING. IT IS ENVISAGED TO INCREASE THE ENERGY EFFICIENCY OF THE BUILDING OF THE BUILDING. 25 % AND ANNUAL REDUCTION. ENERGY DEMAND WILL REACH 68.65 % OF THE TARGET GROUP: PROJECT USERS WILL BE THOSE WHO USE THE TERMOMODERNED PUBLIC SECTOR SITE, IN PARTICULAR IN THE MUNICIPALITY OF ZGIERZ (English)
0 references
Identifiers
RPLD.04.02.01-10-0025/17
0 references