DEVELOPMENT OF THE PROVINCIAL ROAD NO 702 ON FRIDAY — ZGIERZ — AND STAGE (Q101691)

From EU Knowledge Graph
Revision as of 09:11, 9 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The investment in question consists of the extension of the intersection of regional roads 702 and 703 with the extension of the provincial road No 702 from km 19 + 328 to km 19 + 670 and the extension of provincial road No 703 from km 51 + 234 to km 51 + 738,20 (0.84 km — product). The investment in question is located in Łódzkie region, the district of Łęczycki, the municipality of Friday. The scope of the works shall include the following: •...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
DEVELOPMENT OF THE PROVINCIAL ROAD NO 702 ON FRIDAY — ZGIERZ — AND STAGE
Project in Poland financed by DG Regio

    Statements

    0 references
    6,792,650.56 zloty
    0 references
    1,630,236.1343999999 Euro
    13 January 2020
    0 references
    8,249,919.5 zloty
    0 references
    1,979,980.68 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 June 2019
    0 references
    31 December 2019
    0 references
    WOJEWÓDZTWO ŁÓDZKIE
    0 references
    Przedmiotowa inwestycja polega na rozbudowie skrzyżowania dróg wojewódzkich nr 702 i nr 703 wraz z rozbudową drogi wojewódzkiej nr 702 od km 19+328 do km 19+670 i rozbudową drogi wojewódzkiej nr 703 od km 51+234 do km 51+738,20 (0,84km - produkt). Przedmiotowa inwestycja zlokalizowana jest na terenie województwa łódzkiego, powiatu łęczycki, gminie Piątek. Zakres robót budowlanych obejmuje: • rozbudowę istniejącego skrzyżowania drogi wojewódzkich nr 702 i 703 oraz drogi powiatowej nr 511E na skrzyżowanie typu rondo, • rozbudowę drogi wojewódzkiej nr 702, • rozbudowę drogi wojewódzkiej nr 703, • rozbudowę drogi powiatowej nr 5115E, • rozbiórkę i budowę zjazdów wraz z rowami krytymi pod zjazdami, • budowę chodników, • budowę tymczasowej drogi objazdowej wraz z tymczasowym przepustem, • rozbiórkę przepustów i budowę przepustu, • budowę kanalizacji deszczowej, • przebudowę i budowę rowów otwartych i wylotu odwodnienia, • budowę oświetlenia drogowego, • przebudowę sieci elektroenergetycznych, • przebudowę sieci teletechnicznych, • przebudowę sieci wodociągowych, • przebudowę rowów melioracyjnych. W ramach przebudowy infrastruktury kolidującej z inwestycją planuje się: przebudowę sieci elektroenergetycznych, wodociągowej, rowów melioracyjnych oraz sieci teletechnicznych. Ponadto projekt obejmuje m.in.: wycinkę drzew i krzewów kolidujących z inwestycją, odtworzenie i wykonanie oznakowania pionowego i poziomego czy ustawienie barier ochronnych. Projekt przyczyni się do poprawy infrastruktury, zwiększenia komfortu jazdy, poprawy bezpieczeństwa dla wszystkich uczestników ruchu, a także wywrze pozytywny wpływ na środowisko przyrodnicze. Rozbudowana droga będzie przeciwdziałała marginalizacji grup społecznych. Realizacja projektu wpisuje się w osiągnięciu celu jakim jest: „Lepsza dostępność transportowa województwa w ruchu drogowym”.Usługi realizowane w ramach projektu jak i parametry dla przedmiotowego projektu zostały szerzej opisane w Studium Wykonalności (Polish)
    0 references
    The investment in question consists of the extension of the intersection of regional roads 702 and 703 with the extension of the provincial road No 702 from km 19 + 328 to km 19 + 670 and the extension of provincial road No 703 from km 51 + 234 to km 51 + 738,20 (0.84 km — product). The investment in question is located in Łódzkie region, the district of Łęczycki, the municipality of Friday. The scope of the works shall include the following: • Extension of the existing crossing of regional roads No 702 and 703 and district road No 511E to the intersection of the roundabout,• Extension of provincial road No 702,• Extension of provincial road No 703,• Extension of provincial road No 5115E,• construction of pavements,• construction of a temporary ride road,• construction of culverts and construction of culverts,• construction of culverts and construction of open ditches and drainage,• construction of storm water networks, upgrading of networks of telecommunications networks, upgrading of water supply networks, upgrading of water supply networks, upgrading of drainage systems; upgrading of drainage systems; upgrading of drainage systems; upgrading of drainage systems; upgrading of drainage systems; upgrading of drainage systems; upgrading of drainage systems; upgrading of drainage systems; upgrading of drainage systems; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of drainage networks; upgrading of drainage systems; upgrading of drainage systems; upgrading of drainage systems; upgrading of drainage networks; upgrading of water supply networks; upgrading of drainage networks; upgrading of drainage networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of water supply networks; upgrading of drainage networks; upgrading of drainage systems; In connection with the conversion of infrastructure to conflict with the investment, it is planned to: upgrading of electricity, water supply, drainage ditches and networks. In addition, the project includes, but is not limited to: the felling of trees and bushes interfering with the investment, the restoration and execution of vertical and horizontal markings or the setting of protective barriers. The project will improve infrastructure, improve driving comfort, improve safety for all traffic actors, and will have a positive impact on the environment. The extensive road will counteract the marginalisation of social groups. The implementation of the project is part of the achievement of the objective of: “Better transport accessibility for the voivodeship”.The project services and the parameters for this project have been further described in the Feasibility Study. (English)
    0 references

    Identifiers

    RPLD.03.02.01-10-0002/19
    0 references