(A19_067_2015_0670016_1099) A19_067_2015_0670016 (Q2167388)

From EU Knowledge Graph
Revision as of 06:37, 3 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2167388 in Italy
Language Label Description Also known as
English
(A19_067_2015_0670016_1099) A19_067_2015_0670016
Project Q2167388 in Italy

    Statements

    0 references
    85,541.32 Euro
    0 references
    380,183.65 Euro
    0 references
    22.5 percent
    0 references
    2 January 2017
    0 references
    15 March 2021
    0 references
    15 March 2021
    0 references
    UNIVERSITA' DEGLI STUDI DI FIRENZE
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    IL PROGETTO RIGUARDA LO SVILUPPO E LA DIMOSTRAZIONE DI UN SISTEMA AVANZATO DI DIAGNOSTICA PREDITTIVA (PROGNOSTICA) DI TUTTI I PRINCIPALI COMPONENTI DI UN IMPIANTO GEOTERMICO CHE RISULTI INTEGRATO E CONFIGURABILE E CHE PERMETTA DI: ? ESTENDERE L?ATTUALE LIVELLO DI MONITORAGGIO, INCLUDENDO NUOVI COMPONENTI E PROCESSI; ? MONITORARE ON-LINE LO STATO DI SALUTE/PERFORMANCE DELL?IMPIANTO E DEI SUOI SOTTO-SITEMI; ? RICONOSCERE IN ANTICIPO POSSIBILI GUASTI; ? AGGREGARE DIVERSE TIPOLOGIE DI INFORMAZIONI, STRUTTURATE (AD ESEMPIO I DATI DI PROCESSO) E NON STRUTTURATE (COME GLI ORDINI DI MANUTENZIONE); ? DOTARE GLI OPERATORI E I RESPONSABILI DI ESERCIZIO E MANUTENZIONE DEGLI IMPIANTI DI SISTEMI DI ANALISI E DI SUPPORTO ALLE DECISIONI PER L?OTTIMIZZAZIONE DELL?INTERO PARCO. IL SISTEMA SAR? DIMOSTRATO ATTRAVERSO L?IMPLEMENTAZIONE DI UN PRIMO PILOTA SU UNA CENTRALE GEOTERMICA DA 20MWE DI ULTIMA GENERAZIONE E SAR? ESTESO ALLE SEGUENTI SEZIONI: ? POZZI DI ESTRAZIONE E RETE DI TRASPORTO DEL VAPORE GEOTER (Italian)
    0 references
    THE PROJECT CONCERNS THE DEVELOPMENT AND DEMONSTRATION OF AN ADVANCED DIAGNOSTIC (PROGNOSTIC) SYSTEM OF ALL MAJOR COMPONENTS OF A GEOTHERMAL PLANT THAT IS INTEGRATED AND CONFIGURABLE, AND WHICH MAKES IT POSSIBLE TO: ? EXTEND THE CURRENT LEVEL OF MONITORING TO INCLUDE NEW COMPONENTS AND PROCESSES; ? TO MONITOR THE STATE OF HEALTH/PERFORMANCE OF THE PLANT AND ITS SUBCOMPONENTS, ONLINE; ? RECOGNITION IN ADVANCE OF POSSIBLE FAILURES; ? AGGREGATING DIFFERENT TYPES OF INFORMATION, STRUCTURED (E.G. PROCESS DATA) AND UNSTRUCTURED (SUCH AS MAINTENANCE ORDERS); ? GIVE OPERATORS AND OPERATORS RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF SYSTEMS OF ANALYSIS AND SUPPORT FOR DECISION SUPPORT SYSTEMS FOR THE OPTIMISATION OF THE WHOLE PARK. THE SAR SYSTEM? DEMONSTRATED THROUGH THE IMPLEMENTATION OF A FIRST PILOT ON A GEOTHERMAL POWER PLANT OF THE LAST GENERATION OF 20MWE OF THE LAST GENERATION AND SAR? EXTENDED TO THE FOLLOWING SECTIONS: ? EXTRACTION WELLS AND STEAM TRANSPORTATION NETWORK GEOTER (English)
    0 references

    Identifiers