(10360.14072017.115000022) PRIMARY SCHOOL IN THE CAPITAL CITY (Q2155708)

From EU Knowledge Graph
Revision as of 08:05, 23 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2155708 in Italy
Language Label Description Also known as
English
(10360.14072017.115000022) PRIMARY SCHOOL IN THE CAPITAL CITY
Project Q2155708 in Italy

    Statements

    0 references
    146,529.7 Euro
    0 references
    598,080.37 Euro
    0 references
    24.5 percent
    0 references
    3 April 2018
    0 references
    3 April 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI CAVRIGLIA
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    TRASFORMAZIONE DELL?EDIFICIO ESISTENTE IN EDIFICIO AD ENERGIA QUASI ZERO (NZEB) COS? COME PREVISTO ALL?ALLEGATO 1 DEL D.M. 26 GIUGNO 2015 ?REQUISITI MINIMI?. NEL DETTAGLIO SI ANDR? AD ESEGUIRE:- COIBENTAZIONE DELLE PARETI PERIMETRALI ATTRAVERSO L?INSTALLAZIONE DI UN CAPPOTTO ESTERNO IN EPS (?=0,034 W/MK, ?=40 KG/M3), DALLO SPESSORE DI 16 CM;- COIBENTAZIONE DELLA COPERTURE DEGLI EDIFICI MEDIANTE USO DI MATERIALI ISOLANTI TALI DA GARANTIRE TRASMITTANZE TERMICHE PARI O INFERIORI A 0,20 W/MQK.- INSTALLAZIONE DI UN SISTEMA DI BUILDING AUTOMATION CON CRONOTERMOSTATO E VALVOLE TERMOSTATICHE WIRELESS SU OGNI CORPO SCALDANTE CON POSSIBILIT? DI TELEGESTIONE DEGLI IMPIANTI DA REMOTO CONFORMEMENTE A QUANTO PREVISTO AL PAR. 5.7.2 DELLE REGOLE APPLICATIVE DEL CONTO TERMICO 2.0;- SOSTITUZIONE DELLE ATTUALI SUPERFICI VETRATE CON SERRAMENTI AVENTI TELAIO IN PVC A 5 CAMERE CAVE E DOPPIA VETROCAMERA 4+4/15/3/15/3+3 CON DOPPIO TRATTAMENTO BASSO EMISSIVO RIEMPITA IN GAS ARGON;- SOSTITUZIONE DEGLI ATTUALI G (Italian)
    0 references
    CONVERSION OF THE EXISTING BUILDING INTO NZEBS (NZEBS)? AS PROVIDED FOR IN ANNEX 1 TO THE MINISTERIAL DECREE OF 26 JUNE 2015? IN DETAIL, IS ANDR? DO YOU HAVE EXTERNAL WALLS IN EPS (? = 0,034 W/MK,? = 40 KG/M3), 16 CM THICK; — INSULATION OF THE PERIMETER WALLS IN EPS (? = W/MK,? = KG/M), CM IN THICKNESS; — INSULATION OF THE INSULATION OF THE BUILDING COVER BY THE USE OF INSULATING MATERIALS TO ENSURE A THERMAL TRANSMITTANCE OF 0,20 W/MQKD — INSTALLATION OF A SYSTEM OF BUILDING AUTOMATION WITH CHRONOTHERMOSTAT AND A SYSTEM OF “BUILDING AUTOMATION WITH CHRONIC-THERMOSTAT” AND “WIRELESS THERMOSTATIC VALVES” OVER EACH BODY WHICH IS READY TO DO SO? REMOTE MANAGEMENT OF REMOTE MANAGEMENT IN ACCORDANCE WITH PARAGRAPH 5.7.2 OF THE IMPLEMENTING RULES FOR THE THERMAL ACCOUNT 2.0; — REPLACEMENT OF THE CURRENT GLASS SURFACES WITH FRAMES WITH PVC FRAMES TO 5 HOLLOW AND DOUBLE WINDOWS 4 + 4/15/3/15/3 + 3 WITH DOUBLE EMISSION TREATMENT FILLED WITH ARGON; (English)
    0 references
    TRANSFORMATION DU BÂTIMENT EXISTANT EN UN BÂTIMENT À ÉNERGIE QUASI NULLE (NZEB) DONC? COMME PRÉVU À L’ANNEXE 1 DE L’ARRÊTÉ MINISTÉRIEL DU 26 JUIN 2015?EXIGENCES MINIMALES?. EN DÉTAIL, ALLEZ-VOUS Y ALLER? POUR EFFECTUER:- L’ISOLATION DES PAROIS DU PÉRIMÈTRE PAR L’INSTALLATION D’UNE COUCHE EXTÉRIEURE EN EPS (?=0,034 W/MK,?=40 KG/M3), D’UNE ÉPAISSEUR DE 16 CM;- L’ISOLATION DES TOITURES DES BÂTIMENTS À L’AIDE DE MATÉRIAUX ISOLANTS TELS QUE GARANTIR DES TRANSMISSIONS THERMIQUES ÉGALES OU INFÉRIEURES À 0,20 W/MQK.- INSTALLATION D’UN SYSTÈME D’AUTOMATISATION DU BÂTIMENT AVEC CHRONOTHERMOSTAT ET VANNES THERMOSTATIQUES SANS FIL SUR CHAQUE CORPS CHAUFFANT AVEC DES POSSIBILITÉS? GESTION À DISTANCE DES SYSTÈMES CONFORMÉMENT AU PARAGRAPHE 5.7.2 DES RÈGLES RELATIVES À L’APPLICATION DU COMPTE THERMIQUE 2.0;- REMPLACEMENT DES SURFACES VITRÉES ACTUELLES PAR DES CADRES DE FENÊTRE PAR UN CADRE EN PVC À 5 CHAMBRES ET DOUBLE VITRAGE 4+ 4/15/3/15/3+ 3 PAR DOUBLE TRAITEMENT FAIBLEMENT ÉMISSIF REMPLI DE GAZ D’ARGON;- REMPLACEMENT DU COURANT G (French)
    23 December 2021
    0 references

    Identifiers