ID SAID_010 “ENERGY EFFICIENCY AND DISTRICT WATER NETWORKS 6.1” (Q2052472)

From EU Knowledge Graph
Revision as of 10:54, 2 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2052472 in Italy
Language Label Description Also known as
English
ID SAID_010 “ENERGY EFFICIENCY AND DISTRICT WATER NETWORKS 6.1”
Project Q2052472 in Italy

    Statements

    0 references
    1,694,355.0 Euro
    0 references
    3,388,710.0 Euro
    0 references
    50.0 percent
    0 references
    1 March 2014
    0 references
    17 November 2020
    0 references
    ENTE DI GOVERNO DELL'AMBITO DELLA SARDEGNA
    0 references
    0 references
    0 references

    40°43'23.74"N, 8°33'39.64"E
    0 references
    ESECUZIONE DI TUTTI I LAVORI E FORNITURE NECESSARIE PER L¿INTERVENTO DI "PROGRAMMAZIONE DELIBERA CIPE N° 27/2015 - EFFICIENTAMENTO DELLE RETI DI DISTRIBUZIONE IDRICA E RIFACIMENTO ALLACCI NELLA ZONA OPERATIVA 6.1 - COMUNE DI SASSARI". LE OPERE SOMMARIAMENTE POSSONO RIASSUMERSI IN: - ESECUZIONE DELLO SCAVO, POSA IN OPERA DI TUBAZIONE IN G.S. DIAMETRO 300 MM. PER ML. 1.562,51 CON COLLEGAMENTO ALLE CONDOTTE ESISTENTI CON FORNITURA E POSA IN OPERA DI APPARECCHIATURE IDRAULICHE; O REALIZZAZIONE DEL RISANAMENTO DELLA CONDOTTA IN ACCIAIO ALL¿INTERNO DELL¿ATTRAVERSAMENTO FERROVIARIO DI VIA VITTORIO BELLINI CON METODO NON DISTRUTTIVO C.I.P.P. O ESECUZIONE DI ALLACCI ALLE UTENZE IN N° 309; O ESECUZIONE DI DEMOLIZIONE E RIPRISTINO DI PAVIMENTAZIONI STRADALI; O REALIZZAZIONE DELLA GEOREFERENZIAZIONE DELLE OPERE; O LA FORMA E LE DIMENSIONI DELLE OPERE RISULTANO DAL SUCCITATO PROGETTO APPROVATO (Italian)
    0 references
    COMPLETION OF ALL THE WORKS AND SUPPLIES NEEDED FOR THE “PROGRAMMING OF CIPE DECISION NO 27/2015 — THE EFFICIENCY OF THE WATER DISTRIBUTION NETWORKS AND THE RENOVATION OF THE SHOPS IN THE 6.1 OPERATIONAL ZONE — MUNICIPALITY OF SASSARI”. THE FOLLOWING CAN BE SUMMARISED AS FOLLOWS: — EXECUTION OF THE EXCAVATION, PLACING OF PIPES IN G.S. DIAMETER 300 MM. PER ML. 1.562,51 LINKING THE EXISTING PIPELINES TO SUPPLY AND INSTALLATION OF HYDRAULIC EQUIPMENT; OR UNDERTAKING THE REORGANISATION OF THE STEEL LINE DIVISION OF THE PASSAGEWAY BETWEEN VITTORIO BELLINI WITH THE NON-DESTRUCTIVE METHOD OR THE EXECUTION OF ENCLOSURES TO USERS IN N° 309; OR CARRYING OUT DEMOLITION AND REHABILITATION OF ROAD PAVEMENTS; OR THE LOCATION OF GEOREFERENCING THE WORKS; OR THE SHAPE AND SIZE OF THE WORKS RESULT FROM THE APPROVED DESIGN REFERRED TO ABOVE. (English)
    0 references

    Identifiers