    0 references
    360,952.5 Euro
    0 references
    849,300.0 Euro
    0 references
    42.5 percent
    0 references
    17 November 2015
    0 references
    31 August 2018
    0 references
    COMUNE DI SALORNO
    0 references
    0 references

    46°14'22.60"N, 11°12'39.85"E
    0 references
    CON QUESTO PROGETTO IL COMUNE DI SALORNO INTENDE ATTUARE UNA SERIE DI MISURE CONCRETE PER INCREMENTARE L¿EFFICIENZA ENERGETICA, CON IL RISANAMENTO DELL¿EDIFICIO PUBBLICO SITUATO IN PIAZZA SAN GIUSEPPE 9 A SALORNO, P.E. 749, CHE OSPITA IL CORPO VOLONTARIO DEI VIGILI DEL FUOCO.NNNNNI LAVORI COMPORTERANNO IL PASSAGGIO DALLA CLASSE CASACLIMA "F" (EFFICIENZA INVOLUCRO: 204 KWH/M²A, EFFICIENZA COMPLESSIVA: 129 KG CO¿/M²A) ALLA CLASSE CASACLIMA "B" (EFFICIENZA INVOLUCRO: 62 KWH/M²A, EFFICIENZA COMPLESSIVA: 33 KG CO¿/M²A), CON UN RISPARMIO SUL FABBISOGNO TERMICO ANNUALE PER RISCALDAMENTO DI QUASI IL 70% E UN CALO DELL¿INDICE DI EMISSIONE DI CO¿ DEL 74% RISPETTO ALLA SITUAZIONE ATTUALE.NNNLE ATTIVITà CHE SARANNO REALIZZATE COMPRENDONO:NNN - LA COSTRUZIONE DI MURI E TRAMEZZE, ASSISTENZE MURARIE, RIPRISTINO DI MASSETTI, SOTTOFONDI E IMPERMEABILIZZAZIONI;NNN - LA POSA DELLA COIBENTAZIONE TERMICA ¿A CAPPOTTO¿ SULLE PARETI ESTERNE E INTERNE, DEGLI INTONACI INTERNI ED ESTERNI, DEI PAVIME (Italian)
    0 references
    WITH THIS PROJECT, THE MUNICIPALITY OF SALORNO INTENDS TO IMPLEMENT A SERIES OF CONCRETE MEASURES TO INCREASE L ENERGY EFFICIENCY, WITH THE REHABILITATION OF THE PUBLIC BUILDING LOCATED IN PIAZZA SAN GIUSEPPE 9 IN SALORNO, P.E. 749, WHICH HOUSES THE VOLUNTEER CORPS OF THE UOTC-NNNNNNI, WILL INVOLVE THE TRANSITION FROM THE CASACLIMA ‘F’ CLASS (HOUSING EFFICIENCY: 204 KWH/M²A, TOTAL EFFICIENCY: 129 KG CO/M²A) INTO THE CLASS CASACLIMA (B) (HOUSING EFFICIENCY: 62 KWH/M²A, TOTAL EFFICIENCY: 33 KG COADECA-¿/M²A), WITH ANNUAL HEATING NEEDS FOR HEATING OF ALMOST 70 % AND A FALL OF THE CO '74 % EMISSION INDEX COMPARED TO THE SITUATION ATTUALE.NNNLE ACTIVITIES, WHICH WILL BE CARRIED OUT INCLUDE: NNN — THE CONSTRUCTION OF WALLS AND SEPARATION, WORK WITH WALLS, RESTORATION OF SCREEDS, UNDERCOATS AND WATERPROOFING; NNN — THE PLACEMENT OF SPACE INSULATION  ¿A CAPPOSECTORAL THROUGH EXTERNAL AND INTERNAL WALLS, INTERNAL AND EXTERNAL PLASTERS, PAVIME (English)
    0 references
    AVEC CE PROJET, LA MUNICIPALITÉ DE SALORNO A L’INTENTION DE METTRE EN ŒUVRE UNE SÉRIE DE MESURES CONCRÈTES POUR AUGMENTER L’EFFICACITÉ ÉNERGÉTIQUE, AVEC LA RÉNOVATION DU BÂTIMENT PUBLIC SITUÉ SUR LA PIAZZA SAN GIUSEPPE 9 À SALORNO, P.E. 749, QUI ABRITE LE CORPS VOLONTAIRE DES TRAVAUX FUOCO.NNNNNI IMPLIQUERA LA TRANSITION DE LA CLASSE CASACLIMA «F» (ENVELOPPE D’EFFICACITÉ: 204 KWH/M²A, RENDEMENT GLOBAL: 129 KG CO¿/M²A) À LA CLASSE CASACLIMA «B» (EFFICACITÉ DE L’ENCEINTE: 62 KWH/M²A, RENDEMENT GLOBAL: 33 KG CO/M²A), AVEC UNE ÉCONOMIE SUR LA DEMANDE ANNUELLE DE CHAUFFAGE DE PRÈS DE 70 % ET UNE DIMINUTION DE L’INDICE D’ÉMISSION DE CO DE 74 % PAR RAPPORT À LA SITUATION ATTUALE.NNN LES ACTIVITÉS QUI SERONT RÉALISÉES COMPRENDONO:NNN — LA CONSTRUCTION DE MURS ET CLOISONS, AIDES MURALES, RESTAURATION DE CHAPES, SOUS-PLANCHERS ET IMPERMÉABILISATION;NNN — LA POSE D’ISOLATION THERMIQUE SUR LES MURS EXTÉRIEURS ET INTERNES, LES PLÂTRES INTERNES ET EXTERNES, LES REVÊTEMENTS DE SOL (French)
    14 December 2021
    0 references

    Identifiers

    E16G16002300001
    0 references