DIRECTOR CATANZARO-LOCRI (Q2021717)

From EU Knowledge Graph
Revision as of 11:14, 14 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2021717 in Italy
Language Label Description Also known as
English
DIRECTOR CATANZARO-LOCRI
Project Q2021717 in Italy

    Statements

    0 references
    7,237,975.75 Euro
    0 references
    9,797,472.17 Euro
    0 references
    73.88 percent
    0 references
    26 September 2017
    0 references
    20 December 2019
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    38°54'27.50"N, 16°35'45.78"E
    0 references
    GLI INTERVENTI CHE COMPONGONO IL PRESENTE PROGETTO SONO RAPPRESENTATI DALL'IMPLEMENTAZIONE DI 'SMART FUTURE TRASMISSION SYSTEM' ATTRAVERSO L'INSTALLAZIONE DI CONDUTTORI INNOVATIVI AD ALTA TEMPERATURA CHE CONSENTIRANNO DI : AUMENTARE LA CAPACITà DI TRASMISSIONE, DA UN PUNTO ALL'ALTRO DELLA RETE DI TRASMISSIONE STESSA E TRA QUESTA E LE RETI DI DISTRIBUZIONE, DI TUTTE QUELLE INFORMAZIONI INDISPENSABILI PER IL CORRETTO SVOLGIMENTO DELL'ATTIVITà DI GESTIONE ATTIVA DELLA RETE ELETTRICA E DI DISPACCIAMENTO PREVENIRE LA FORMAZIONE DI COLLI DI BOTTIGLIA NELLE INTERCONNESSIONI TRA RETE DI TRASMISSIONE E RETI DI DISTRIBUZIONE OTTIMIZZARE IL TRASPORTO DI ENERGIA ELETTRICA IN MODO DA CONSENTIRE UN MIGLIORE UTILIZZO DELLA CAPACITà DI TRANSITO DEGLI ELETTRODOTTI ESISTENTI AUMENTARE LA QUANTITà DI ENERGIA ELETTRICA EROGABILE IN RETE DAGLI IMPIANTI FER, CONTINUANDO, NEL CONTEMPO, AD ESERCIRE LA RETE STESSA IN CONDIZIONI DI SICUREZZA. INCREMENTARE LA CAPACITà DELLA RETE DI ASSORBIRE UNA MAGGIO (Italian)
    0 references
    THE MEASURES WHICH MAKE UP THIS PROJECT CONSIST OF THE IMPLEMENTATION OF ‘SMART FUTURE TRANSMISSION SYSTEM’ THROUGH THE INSTALLATION OF INNOVATIVE HIGH TEMPERATURE CONDUCTORS WHICH WILL: INCREASING THE CAPACITY TO TRANSMIT, FROM ONE POINT TO THE OTHER OF THE TRANSMISSION NETWORK ITSELF AND BETWEEN THE TRANSMISSION NETWORK AND THE DISTRIBUTION NETWORKS, ALL THE INFORMATION THAT IS ESSENTIAL FOR THE ACTIVE MANAGEMENT OF THE ELECTRICITY SYSTEM AND DISPATCHING NETWORKS TO PREVENT THE FORMATION OF BOTTLENECKS IN THE INTERCONNECTIONS BETWEEN THE TRANSMISSION NETWORKS AND THE DISTRIBUTION NETWORKS, OPTIMISING THE TRANSPORT OF ELECTRICITY SO AS TO ALLOW BETTER USE OF THE EXISTING ELECTRICITY TRANSMISSION CAPACITY OF THE EXISTING ELECTRICITY LINES, WHILE CONTINUING TO OPERATE THE NETWORK SAFELY. INCREASING THE NETWORK’S CAPACITY TO ABSORB A MAY (English)
    0 references
    LES INTERVENTIONS QUI COMPOSENT CE PROJET SONT REPRÉSENTÉES PAR LA MISE EN ŒUVRE D’UN «SYSTÈME DE TRASMISSION FUTUR INTELLIGENT» À TRAVERS L’INSTALLATION DE CONDUCTEURS INNOVANTS À HAUTE TEMPÉRATURE QUI PERMETTRONT: AUGMENTER LA CAPACITÉ DE TRANSPORT, D’UN POINT À L’AUTRE DU RÉSEAU DE TRANSPORT LUI-MÊME ET ENTRE LE RÉSEAU DE TRANSPORT LUI-MÊME ET LES RÉSEAUX DE DISTRIBUTION, DE TOUTES CES INFORMATIONS ESSENTIELLES POUR LA BONNE EXÉCUTION DE L’ACTIVITÉ DE GESTION ACTIVE DU RÉSEAU D’ÉLECTRICITÉ ET DE DISPATCHING EMPÊCHENT LA FORMATION DE GOULETS D’ÉTRANGLEMENT DANS LES INTERCONNEXIONS ENTRE LE RÉSEAU DE TRANSPORT ET LES RÉSEAUX DE DISTRIBUTION D’OPTIMISER LE TRANSPORT D’ÉLECTRICITÉ AFIN DE PERMETTRE UNE MEILLEURE UTILISATION DE LA CAPACITÉ DE TRANSIT DES LIGNES ÉLECTRIQUES EXISTANTES POUR AUGMENTER LA QUANTITÉ D’ÉLECTRICITÉ FOURNIE AU RÉSEAU PAR DES INSTALLATIONS SER, TOUT EN CONTINUANT À EXPLOITER LE RÉSEAU DANS UN ÉTAT SÛR. AUGMENTER LA CAPACITÉ DU RÉSEAU À ABSORBER UN MAI (French)
    14 December 2021
    0 references

    Identifiers

    G63G17001360007
    0 references