DIRECTOR SIMERI-MUCONE (Q2021716)

From EU Knowledge Graph
Revision as of 04:39, 2 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2021716 in Italy
Language Label Description Also known as
English
DIRECTOR SIMERI-MUCONE
Project Q2021716 in Italy

    Statements

    0 references
    1,139,758.92 Euro
    0 references
    1,542,801.01 Euro
    0 references
    73.88 percent
    0 references
    13 March 2018
    0 references
    30 November 2020
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    38°57'17.96"N, 16°38'28.00"E
    0 references
    IL PRESENTE PROGETTO RIGUARDA INTERVENTI DI ADEGUAMENTO DELLA LINEA DI TRASPORTO A 150 KV SIMERI-CATANZARO ATTRAVERSO LA SOSTITUZIONE DI CONDUTTORI CON CONDUTTORI INNOVATIVI AD ALTA CAPACITà (CONDUTTORI A CORDA DI LEGA DI ALLUMINIO (ZTAL) - LEGA FE-NI RIVESTITA DI ALLUMINIO (ACI) Ø 22,75 MM), INSTALLAZIONE DI COMPONENTI TECNOLOGICAMENTE AVANZATI QUALI PHASOR MEASUREMENT UNIT PRESSO LE S.E. DI CATANZARO, CALUSIA E MUCONE E L'INSTALLAZIONE DI UN TRASFORMATORE AD OLIO VEGETALE (DI NUOVA GENERAZIONE) PRESSO LA STAZIONE DI CATANZARO. (Italian)
    0 references
    THIS PROJECT RELATES TO THE ADAPTATION OF THE TRANSPORT LINE OF 150 KV SIMERI-CATANZARO THROUGH THE REPLACEMENT OF CONDUCTORS WITH AN ALUMINIUM ALLOY ROPE (ZTAL) — WITH ALUMINIUM ALLOY CORD (ACI) BEING 22.75 MM), INSTALLATION OF TECHNOLOGICALLY ADVANCED COMPONENTS SUCH AS PHASOR MEASUREMENT UNIT IN CATANZARO, CALUSIA AND MUCONE AND THE INSTALLATION OF A (NEW GENERATION) PLANT TRANSFORMER IN CATANZARO PLANT. (English)
    0 references

    Identifiers

    G83G17000840007
    0 references