Tworóg-Tworzeń pipeline (Q86134)

From EU Knowledge Graph
Revision as of 10:18, 4 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line, e...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Tworóg-Tworzeń pipeline
Project in Poland financed by DG Regio

    Statements

    0 references
    218,673,195.0 zloty
    0 references
    52,481,566.8 Euro
    13 January 2020
    0 references
    1 January 2014
    0 references
    30 September 2021
    0 references
    OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
    0 references

    50°26'38.8"N, 19°7'26.8"E
    0 references

    50°28'15.6"N, 19°13'54.8"E
    0 references

    50°22'8.8"N, 19°17'23.6"E
    0 references

    50°29'39.5"N, 18°57'51.1"E
    0 references

    50°27'50.0"N, 19°2'34.1"E
    0 references

    50°27'55.4"N, 18°50'1.0"E
    0 references

    50°31'54.8"N, 18°43'7.3"E
    0 references
    Przedmiotem projektu jest budowa gazociągu DN1000 MOP 8,4MPa o długości 55 km na odcinku od projektowanego węzła Tworóg (realizowanego w ramach projektu Kędzierzyn – Tworóg: województwo śląskie, powiat tarnogórski) do zespołu zaporowo - upustowego Tworzeń (województwo śląskie, miasto Dąbrowa Górnicza) wraz z infrastrukturą: 5 zespołów zaporowo-upustowych na trasie gazociągu, urządzenia ochrony katodowej, system łączności i sterowania – linia światłowodowa, przyłącza energetyczne. (Polish)
    0 references
    The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line, energy connections. (English)
    0 references

    Identifiers

    POIS.07.01.00-00-0016/17
    0 references