Regeneration of household apartment 7, Rhine river (Q75322)

From EU Knowledge Graph
Revision as of 06:29, 27 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project content is to reduce the energy performance of the building stock by 14 dwellings to be located on ul. Ring-7 on the Rhine and was built more than 80 years ago. The project will include the insulation of the building facades of the house by the contact warm up, the insulation of a skirting board of extruded polystyrene, the insulation of subsearching above the basement, the insulation of the ground floor, the fitting out of new cella...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Regeneration of household apartment 7, Rhine river
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,127,596.5 Czech koruna
    0 references
    45,103.86 Euro
    10 January 2020
    0 references
    3,758,655.0 Czech koruna
    0 references
    150,346.2 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    19 May 2016
    0 references
    31 December 2017
    0 references
    31 December 2017
    0 references
    Město Rýmařov
    0 references
    0 references
    79501
    0 references
    Obsahem projektu je snížení energetické náročnosti budovy bytového domu o 14 bytových jednotkách, který se nachází na ul. Okružní 7 v Rýmařově a byl postaven před více než 80-ti lety. V rámci projektu bude provedeno zateplení fasády domu kontaktním zateplovacím systémem, zateplení soklu extrudovaným polystyrénem, zateplení podhledů nad suterénem, zateplení podlahy půdy, osazení nových sklepních oken a balkónových dveří (k výměně veškerých oken nájemníků za nové plastové došlo již v minulosti). (Czech)
    0 references
    The project content is to reduce the energy performance of the building stock by 14 dwellings to be located on ul. Ring-7 on the Rhine and was built more than 80 years ago. The project will include the insulation of the building facades of the house by the contact warm up, the insulation of a skirting board of extruded polystyrene, the insulation of subsearching above the basement, the insulation of the ground floor, the fitting out of new cellars and the balcony door (to exchange all the windows of the tenants for the new plastic have already occurred in the past). (English)
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0001839
    0 references