Reconstruction of the railway upper and TV in km 17,200-18,000 of the line Ústí nad Labem — Most_1 (Q72273)

From EU Knowledge Graph
Revision as of 19:50, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project content is the reconstruction of the railway track in km 17,200-18,000 of line No 130 of Ústí nad Labem — Chomutov. The line is part of the TEN-T comprehensive network and will include the extension of the non-compliant distance between track centres, the modification of the traction line and the rebuilding of the bridge in km 17,705, which is currently in the emergency state, with a reduced speed of 40 km/h., Adding English summary)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the railway upper and TV in km 17,200-18,000 of the line Ústí nad Labem — Most_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    127,047,090.25 Czech koruna
    0 references
    5,081,883.61 Euro
    10 January 2020
    0 references
    154,920,362.0 Czech koruna
    0 references
    6,196,814.48 Euro
    10 January 2020
    0 references
    82.0079998586629 percent
    0 references
    16 May 2018
    0 references
    30 November 2019
    0 references
    Správa železniční dopravní cesty, státní organizace
    0 references

    50°5'20.22"N, 14°25'13.04"E
    0 references

    50°5'7.01"N, 14°25'23.81"E
    0 references
    11000
    0 references
    Obsahem projektu je rekonstrukce železničního svršku v km 17,200 - 18,000 trati č. 130 Ústí nad Labem - Chomutov. Trať je součástí globální sítě TEN-T. Rekonstrukce bude zahrnovat rozšíření nevyhovujících osových vzdáleností kolejí, úpravy trakčního vedení a přestavbu mostu v km 17,705, který je v současnosti v havarijním stavu a je na něm zavedena snížená rychlost 40 km/h. (Czech)
    0 references
    The project content is the reconstruction of the railway track in km 17,200-18,000 of line No 130 of Ústí nad Labem — Chomutov. The line is part of the TEN-T comprehensive network and will include the extension of the non-compliant distance between track centres, the modification of the traction line and the rebuilding of the bridge in km 17,705, which is currently in the emergency state, with a reduced speed of 40 km/h. (English)
    0 references

    Identifiers

    CZ.04.1.41/0.0/0.0/15_001/0000196
    0 references