Reconstruction of pavements along the i/14 road in České Třeboč- Stage 2 (Q62695)

From EU Knowledge Graph
Revision as of 11:33, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The purpose of the project is the construction of a new section of the walkway along the short part of the busy road section of the I/14 road. The absence of a pedestrian at the site does not allow for safe and barrier-free movement in the case of permanent communication. The project will ensure the continuity of the new walkway on existing, barrier-free, walking line infrastructure. The intention is to eliminate the dangerous and potentially co...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of pavements along the i/14 road in České Třeboč- Stage 2
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    659,821.65 Czech koruna
    0 references
    26,392.866 Euro
    1 October 2020
    0 references
    694,549.11 Czech koruna
    0 references
    27,781.9644 Euro
    1 October 2020
    0 references
    94.9999993520976 percent
    0 references
    1 January 2018
    0 references
    23 October 2018
    0 references
    31 December 2019
    0 references
    Město Česká Třebová
    0 references
    0 references
    56002
    0 references
    Předmětem projektu je výstavba nového úseku chodníku podél krátké části úseku frekventované silnice I/14. Absence chodníku v lokalitě neumožňuje bezpečný a bezbariérový pohyb u frekventované komunikace. Projekt zajistí návaznost nového chodníku na stávající, bezbariérovou, pěší liniovou infrastrukturu. Záměrem je eliminovat nebezpečné a potenciálně kolizní situace, které u rušné silnice v každodenním provozu vznikají. (Czech)
    0 references
    The purpose of the project is the construction of a new section of the walkway along the short part of the busy road section of the I/14 road. The absence of a pedestrian at the site does not allow for safe and barrier-free movement in the case of permanent communication. The project will ensure the continuity of the new walkway on existing, barrier-free, walking line infrastructure. The intention is to eliminate the dangerous and potentially conflict situations which arise from busy roads in everyday traffic. (English)
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0007861
    0 references