Decentralisation of central heating at ASTRO Vlashim s.r.o. (Q61666)

From EU Knowledge Graph
Revision as of 11:09, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project concerns the disconnection of existing non-compliant heat source from steam boiler and its replacement by 3 local gas condensing boilers which will be located in a production house (boiler with a rated output of 350 kW), a coterminally and an administrative building (2 boilers, each with a rated output of 45 kW). The project envisages slight improvements to the installation of new sources of heat. In addition, a new heating system wi...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Decentralisation of central heating at ASTRO Vlashim s.r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,316,593.04 Czech koruna
    0 references
    92,663.7216 Euro
    10 January 2020
    0 references
    3,860,988.41 Czech koruna
    0 references
    154,439.5364 Euro
    10 January 2020
    0 references
    59.9999998445994 percent
    0 references
    28 June 2017
    0 references
    30 June 2019
    0 references
    ASTRO Vlašim spol. s r.o.
    0 references
    0 references

    49°42'45.54"N, 14°55'45.88"E
    0 references

    49°42'10.76"N, 14°54'17.17"E
    0 references

    49°43'22.76"N, 14°57'7.34"E
    0 references

    49°44'2.26"N, 14°57'58.03"E
    0 references
    25801
    0 references
    Předmětem projektu je odpojení stávajícího nevyhovujícího zdroje tepla z parní kotelny a jeho náhrada 3 místními plynovými kondenzačními kotly, které se budou nacházet ve výrobní hale (kotel o jmenovitém výkonu 350 kW), kotelně a administrativní budově (2 kotle, každý o jmenovitém výkonu 45 kW). V rámci projektu se počítá s drobnými stavebními úpravami nutnými pro instalaci nových zdrojů tepla. Dále bude provedena nová otopná soustava - dvoutrubková teplovodní s novými deskovými otopnými tělesy. (Czech)
    0 references
    The project concerns the disconnection of existing non-compliant heat source from steam boiler and its replacement by 3 local gas condensing boilers which will be located in a production house (boiler with a rated output of 350 kW), a coterminally and an administrative building (2 boilers, each with a rated output of 45 kW). The project envisages slight improvements to the installation of new sources of heat. In addition, a new heating system will be carried out with new plates on hot water bodies. (English)
    0 references

    Identifiers

    CZ.05.2.32/0.0/0.0/15_008/0000982
    0 references