Photovoltaic installation at the San Ład Plant (Q137755)

From EU Knowledge Graph
Revision as of 20:08, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q137755 in Poland
Language Label Description Also known as
English
Photovoltaic installation at the San Ład Plant
Project Q137755 in Poland

    Statements

    0 references
    75,259.85 zloty
    0 references
    18,062.36 Euro
    13 January 2020
    0 references
    88,541.0 zloty
    0 references
    21,249.84 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    17 December 2017
    0 references
    22 January 2019
    0 references
    ZAKŁAD WYWOZU NIECZYSTOŚCI ŁAD-SAN S.C. TADEUSZ SZWED, KRYSTYNA SZWED
    0 references
    0 references
    Projekt dotyczy budowy systemu 76 paneli fotowoltaicznych o mocy 20,15kWp, 3 falowników oraz pozostałych istotnych podzespołów niezbędnych do prawidłowego funkcjonowania systemu PV. Powierzchnia modułów wyniesie 127,4 m2. Instalacja zostanie podłączona od obecnej sieci elektroenergetycznej budynku. System wyprodukuje 19036 kWh energii elektrycznej i jednocześnie przyczyni się do redukcji zanieczyszczeń i pyłów 15,81 tony CO2 rocznie. Zaprojektowana sieć elektryczna umożliwi wprowadzanie energii do sieci elektroenergetycznej. Odpowiednio dobrana moc instalacji sprawia, iż firma nie będzie czerpała zysków z ewentualnych nadwyżek energii. Instalacja pokryje całkowicie popyt na energię podmiotu. Instalacja o mocy 20,15 kWp będzie składała się z: 76 paneli fotowoltaicznych o mocy jednostkowej 265 Wp, Inwerterów trójfazowych, Systemu montażowego przeznaczonego do instalacji fotowoltaicznych usytuowanych na dachu, Okablowania, Rozdzielnic elektrycznych, Konektorów żeńskich i męskich typu MC4, Systemu monitoringu. Firma Ład-San w ramach realizacji projektu przewiduje następujące działania: działania: Działanie nr 1 – Prace przygotowawcze - Wykonanie projektu koncepcyjnego instalacji oraz wyłonienie podwykonawców, Działanie nr 2 - Wybór wykonawcy, Działanie nr 3 - Realizacja rzeczowa projektu - Zakup i montaż opisanych wyżej instalacji fotowoltaicznych oraz czynności administracyjne(zgłoszenie, umowa i podłączenie do sieci), Działanie nr 4 - Promocja - zakup i montaż dwóch tablic informacyjno-promocyjnych. (Polish)
    0 references
    The project concerns the construction of a system of 76 photovoltaic panels with a power of 20.15kWp, 3 inverters and other important components necessary for the proper functioning of the PV system. The area of the modules will be 127.4 m². The installation will be connected from the current electricity grid of the building. The system will produce 19036 kWh of electricity and at the same time reduce pollutants and dusts of 15.81 tonnes of CO2 per year. The designed electricity grid will allow energy to be introduced into the electricity grid. The appropriately selected power of the installation means that the company will not profit from any surplus energy. The installation will fully cover the entity’s energy demand. The installation with a power of 20,15 kWp will consist of: 76 photovoltaic panels with unit power of 265 Wp, three-phase inverters, mounting system designed for photovoltaic installations located on the roof, wiring, electrical dividers, female and male connectors type MC4, monitoring system. Ład-San as part of the project envisages the following activities: actions: Action No 1 – Preparatory Works – Implementation of the conceptual design of the installation and selection of subcontractors, Measure No. 2 – Selection of the contractor, Measure No. 3 – Realisation of the project – Purchase and assembly of the photovoltaic installations described above and administrative activities (notification, contract and network connection), Measure No.4 – Promotion – purchase and assembly of two information and promotional boards. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-B066/17
    0 references