Thermal modernisation of the School Complex in Sieroszewice. Thermal Modernisation of the School Complex in Wielowsi (Q134854)

From EU Knowledge Graph
Revision as of 20:04, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q134854 in Poland
Language Label Description Also known as
English
Thermal modernisation of the School Complex in Sieroszewice. Thermal Modernisation of the School Complex in Wielowsi
Project Q134854 in Poland

    Statements

    0 references
    856,765.81 zloty
    0 references
    205,623.79 Euro
    13 January 2020
    0 references
    1,007,959.78 zloty
    0 references
    241,910.35 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 October 2015
    0 references
    1 October 2018
    0 references
    GMINA SIEROSZEWICE
    0 references
    1. Przedmiot projektu Przedmiotem projektu jest kompleksowa modernizacja energetyczna 2 budynków użyteczności publicznej na terenie gminy Sieroszewice 2. Zakres rzeczowy 2.1. Budynek Szkoły Podstawowej w Sieroszewicach – adres: Sieroszewice, ul. Szkolna 9: - termomodernizacja stropodachu warstwą gr. 15 cm granulowanej wełny mineralnej o współczynniku ?=0,041W/(mK) na stropie parteru i I piętra; - docieplenie ścian zewnętrznych piwnicy warstwą gr. 12 cm styropianu o współczynniku ?=0,040W/(mK); - docieplenie ścian zewnętrznych parteru i piętra warstwą gr. 12 cm styropianu o współczynniku ?=0,040W/(mK); - wymiana okien istniejących o współczynniku U =2,2 W/(m2*K) na okna o współczynniku U=1,1 W/(m2*K); - wymiana drzwi zewnętrznych istniejących o współczynniku U =2,7 W/(m2*K) na drzwi o współczynniku U=1,1-1,6 W/(m2*K). 2.2. Budynek Szkoły Podstawowej w Wielowsi - adres: Wielowieś, ul. Grabowska 2: - termomodernizacja stropodachu warstwą gr. 15 cm wełny mineralnej granulowanej o współczynniku ?=0,052W/(mK) na stropie parteru; - docieplenie ścian zewnętrznych piwnicy warstwą gr. 12 cm styropianu o współczynniku ?=0,040W/(mK); - docieplenie ścian zewnętrznych parteru warstwą gr. 12 cm styropianu o współczynniku ?=0,040W/(mK); - wymiana okien istniejących o współczynniku U =1,8 W/(m2*K) na okna o współczynniku U=1,1 W/(m2*K); - wymiana drzwi zewnętrznych istniejących o współczynniku U =2,5 W/(m2*K) na drzwi o współczynniku U=1,1-1,6 W/(m2*K); - wymiana instalacji centralnego ogrzewania i kotłów. 3. Produkty projektu W wyniku realizacji projektu zostaną osiągnięte następujące produkty: - Liczba zmodernizowanych energetycznie budynków – 2 szt. - Powierzchnia użytkowa budynków poddanych termomodernizacji – 3 361,7 m2; - Liczba zmodernizowanych źródeł ciepła – 1 szt. (Polish)
    0 references
    1. Subject of the project The subject of the project is comprehensive energy modernisation of 2 public utility buildings in the municipality of Sieroszewice 2. Material scope 2.1. Building of the Primary School in Sieroszewice – address: Sieroszewice, ul. School day 9: — thermo-modernisation of the stropode with a layer of gr. 15 cm of granulated mineral wool with a coefficient?=0,041W/(mK) on the floor floor and the first floor; — insulation of the outer walls of the basement with a layer of gr. 12 cm of styrofoam with a factor of?=0,040W/(mK); — insulation of the exterior walls of the ground floor and floor with a layer of 12 cm styrofoam with a factor of?=0,040W/(mK); — replacement of existing windows with U = 2,2 W/(m²*K) for windows with U = 1,1 W/(m²*K); — replacement of existing external doors with a factor U = 2,7 W/(m²*K) for a door with a factor U=1.1-1.6 W/(m²*K). IT’S 2.2. Building of the Primary School in Wielowsi – address: Big boy, hive. Grabowska 2: — thermo-modernisation of the stropode with a layer of gr. 15 cm of granulated mineral wool with a coefficient?=0,052W/(mK) on the floor floor; — insulation of the outer walls of the basement with a layer of gr. 12 cm of styrofoam with a factor of?=0,040W/(mK); — warming of the outer walls of the ground floor with a layer of 12 cm of styrofoam with a factor of?=0,040W/(mK); — replacement of existing windows with U = 1,8 W/(m²*K) for windows with U = 1,1 W/(m²*K); — replacement of existing external doors with a factor U = 2,5 W/(m²*K) for a door with a factor U=1.1-1.6 W/(m²*K); — replacement of central heating and boiler systems. 3. Project products As a result of the project, the following products will be achieved: — Number of energy-upgraded buildings – 2 pieces. — The usable area of buildings undergoing thermal upgrade – 3361,7 m²; — Number of modernised heat sources – 1 pcs. (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.03.02.04-30-0002/16
    0 references