Thermal modernisation of the building of Odery No. 4 in Stargard, belonging to the Voivodeship Centre for Occupational Medicine – Zachodniopomorskie Centre for Treatment and Prevention in Szczecin (Q137613)

From EU Knowledge Graph
Revision as of 21:32, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q137613 in Poland
Language Label Description Also known as
English
Thermal modernisation of the building of Odery No. 4 in Stargard, belonging to the Voivodeship Centre for Occupational Medicine – Zachodniopomorskie Centre for Treatment and Prevention in Szczecin
Project Q137613 in Poland

    Statements

    0 references
    1,500,214.77 zloty
    0 references
    360,051.54 Euro
    13 January 2020
    0 references
    1,764,958.57 zloty
    0 references
    423,590.06 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 September 2016
    0 references
    30 June 2020
    0 references
    WOJEWÓDZKI OŚRODEK MEDYCYNY PRACY - ZACHODNIOPOMORSKIE CENTRUM LECZENIA I PROFILAKTYKI W SZCZECINIE
    0 references
    0 references
    Projekt ma charakter stacjonarny. Projekt polega na termomodernizacji budynku Przychodni Kolejowej przy ul. Adama Mickiewicza 18 w Stargardzie. Zakres planowanych prac jest szerszy niż koszty kwalifikowalne (KK) projektu. Podyktowane jest to potrzebami i problemami zidentyfikowanymi w budynku oraz racjonalnością wykonania prac przez jednego wykonawcę w jednym czasie. Kwalifikowalny zakres projektu wynika z audytu energetycznego oraz audytu oświetlenia wbudowanego wykonanych dla budynku i jest z nimi zgodny. W ramach KK planuje się wykonanie poniższych prac: 1. Usprawnienie instalacji grzewczej 2. Docieplenie - ściana zewnętrzna 3. Docieplenie - strop przy przepływie ciepła z dołu do góry 4. Wymiana stolarki drzwiowej 5. Wymiana stolarki okiennej 6. Docieplenie - ściana zewnętrzna 7. Usprawnienie wentylacji 8. Docieplenie - dach II piętra 9. Docieplenie - podłoga na gruncie 10. Usprawnienie instalacji podgrzewania c.w.u. 11. Docieplenie - ściana w gruncie 12. Wymiana oświetlenia i montaż paneli fotowoltaicznych o łącznej mocy 2,5 kW. W ramach projektu planuje się ponadto wykonanie m.in. prac remontowych wewnątrz budynku, wymianę pokrycia dachu, wyburzenie parterowej przybudówki – będą to koszty niekwalifikowalne. Najważniejsze etapy realizacji projektu: 1. Opracowanie dok. projektowej oraz wykonawczej,uzyskanie wymaganych decyzji adm. -I – II kw. 2013 r. 2. Opracowanie audytów energ. -IV kw. 2016 r. 3. Aktualizacja dokumentacji wykonawczej -IV kw. 2016 r. – I kw. 2017 r. 4. Opracowanie dok. aplikacyjnej - IV kw. 2016 r. 5. Przygotowanie oraz przeprow. postępowań o udzielenie zamówień publi. - IV kw. 2017 r 6. Wykonanie prac budowlanych - II kw. 2018r. – II kw. 2019r. 7. Opracowanie i montaż materiałów demonstracyjnych - II kw. 2019 8. Nadzór nad realizacją projektu - II kw. 2018 r. – II kw. 2019 9. Koordynowanie prac związanych z realizacją projektu, prowadzenie dokumentacji projektowej i rozliczeń finansowych-IV kw. 2016r.- II kw.2019 r. (Polish)
    0 references
    The project is stationary. The project consists of the thermomodernisation of the Railway Clinic building at ul. Adam Mickiewicz 18 in Stargard. The scope of the planned work is broader than the eligible costs (KK) of the project. This is due to the needs and problems identified in the building and the rationality of the execution of the work by one contractor at one time. The eligible scope of the project results from energy audit and built-in lighting audit for the building and is compatible with them. The KK is planning to carry out the following work: 1. Improvement of heating installation 2. Warming – outer wall 3. Warming – ceiling with heat flow from the bottom to the top 4. Replacement of door carpentry 5. Replacement of window carpentry 6. Warming – outer wall 7. Improved ventilation 8. Warming – the roof of the second floor 9. Warming – floor on the ground 10. Improvement of heating installation 11. Warming – a wall in the ground 12. Replacement of lighting and installation of photovoltaic panels with a total power of 2.5 kW. The project also plans to perform, among others, renovation works inside the building, replacement of the roof covering, demolition of a one-storey annex – these will be ineligible. The most important stages of the project are: 1. Development of project and implementation docs,obtaining the required decisions adm. —I – II sq. 2013. 2. Development of energ audits. —IV quarter 2016. 3. Update of the implementing documentation -IV quarter 2016 – I quarter 2017. 4. Application dock development – IV sq. 2016. 5. Preparation and apology of publi procurement procedures. IV sq. 2017, 6. Execution of construction works – II sq. 2018. — Second quarter 2019. 7. Development and assembly of demonstration materials – II sq. IT’S 2019 8. Supervising the implementation of the project – II sq. 2018 – Second quarter IT’S 2019 9. Co-ordinating works related to the implementation of the project, conducting project documentation and financial statements – IV sq. 2016 – Second quarter of 2019 (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.05.00-32-A032/16
    0 references