Analysis of run-off ratios including proposals for possible flood protection measures at the Třeboň basin district (Q58214)

From EU Knowledge Graph
Revision as of 11:12, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project will produce a study of the run-off ratios, including proposals for possible flood protection measures in areas with potential flood risk in the Třeboň basin, as a basis for subsequent implementation., Adding English summary)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Analysis of run-off ratios including proposals for possible flood protection measures at the Třeboň basin district
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    844,421.53 Czech koruna
    0 references
    33,776.8612 Euro
    10 January 2020
    0 references
    993,437.1 Czech koruna
    0 references
    39,737.484 Euro
    10 January 2020
    0 references
    84.9999994966969 percent
    0 references
    16 June 2017
    0 references
    26 July 2018
    0 references
    31 December 2019
    0 references
    Městská část Praha-Čakovice
    0 references
    0 references

    50°9'18.40"N, 14°31'41.84"E
    0 references
    19600
    0 references
    V rámci projektu bude pořízena studie odtokových poměrů včetně návrhů možných protipovodňových opatření v oblastech s potenciálním povodňovým rizikem v povodí Třeboradického potoka jako podklad pro následnou realizaci. (Czech)
    0 references
    The project will produce a study of the run-off ratios, including proposals for possible flood protection measures in areas with potential flood risk in the Třeboň basin, as a basis for subsequent implementation. (English)
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/16_035/0002155
    0 references