I/34 Roštany road — outlook (Q57706)

From EU Knowledge Graph
Revision as of 10:42, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The purpose of the project is the construction of the I/34 road in category S 11,5/70 in category S, of the overall length of the main route of 2.888 km, situated north of the local part of the municipality of Popríštany. The implementation of the project will lead to a reduction in driving time and the fluidity of road transport on the I/34 road and to improve road safety, including pedestrian safety. In addition, the burden on the inhabitants...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
I/34 Roštany road — outlook
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    191,297,016.9 Czech koruna
    0 references
    7,651,880.676 Euro
    10 January 2020
    0 references
    225,055,314.0 Czech koruna
    0 references
    9,002,212.56 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    15 December 2016
    0 references
    31 October 2019
    0 references
    Ředitelství silnic a dálnic ČR
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba přeložky silnice I/34 v kategorii S 11,5/70 v celkové délce hlavní trasy 2,888 km, která je situována severně od místní části obce Pohled zvané Rouštany. Realizací projektu dojde ke zkrácení jízdní doby a zvýšení plynulosti dopravy na silnici I/34 a zvýšení bezpečnosti silničního provozu včetně bezpečnosti chodců. Odvedením tranzitní dopravy mimo zástavbu obce se rovněž sníží zátěž obyvatel hlukem a exhalacemi z automobilové dopravy. (Czech)
    0 references
    The purpose of the project is the construction of the I/34 road in category S 11,5/70 in category S, of the overall length of the main route of 2.888 km, situated north of the local part of the municipality of Popríštany. The implementation of the project will lead to a reduction in driving time and the fluidity of road transport on the I/34 road and to improve road safety, including pedestrian safety. In addition, the burden on the inhabitants of noise and exhalations from car traffic will be reduced by the non-installation of the Community transit traffic. (English)
    0 references

    Identifiers

    CZ.04.3.42/0.0/0.0/15_004/0000104
    0 references