Construction of a bicycle path on the area of the closed railway line Szczytno – Biskupiec in the Municipality of Szczytno and Szczytno commune (Q132648)

From EU Knowledge Graph
Revision as of 19:21, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q132648 in Poland
Language Label Description Also known as
English
Construction of a bicycle path on the area of the closed railway line Szczytno – Biskupiec in the Municipality of Szczytno and Szczytno commune
Project Q132648 in Poland

    Statements

    0 references
    969,761.13 zloty
    0 references
    232,742.67 Euro
    13 January 2020
    0 references
    1,198,715.86 zloty
    0 references
    287,691.81 Euro
    13 January 2020
    0 references
    80.9 percent
    0 references
    27 December 2016
    0 references
    30 December 2019
    0 references
    POWIAT SZCZYCIEŃSKI
    0 references

    53°33'49.3"N, 20°59'48.8"E
    0 references
    Przedmiotem projektu jest budowa ścieżki rowerowej na obszarze nieczynnej linii kolejowej Szczytno-Biskupiec na terenie Gminy Miejskiej Szczytno i Gminy Szczytno. W ramach projektu zaplanowano: - budowę ścieżki rowerowej dwukierunkowej – pas jezdny o nawierzchni bitumicznej szerokości 3,0 m, - wykonanie dwóch zjazdów z nasypów w km 6+650,50 i w km 7+760,50 -zjazdy posiadają nawierzchnię z kruszywa łamanego - konserwację zieleni, rowów i przepustów pod nasypem i wzdłuż ścieżki - poza ścieżką rowerową o nawierzchni z mas bitumicznych i poboczami trawiastymi pasami wolnymi od krzewów i drzew, przewidziano pasy zieleni obustronne, podlegające konserwacji ogrodniczej i estetyzacji. - remont wiaduktu murowanego w km 6+482 - remont wiaduktu stalowego w km 7+671 - budowę miejsca obsługi rowerzystów - miejsce obsługi rowerzystów składa się z wiaty, 2 koszy na śmieci, stojaków dla 12 szt. rowerów , stołu i ławek, oraz tablicy informacyjnej. Etapy realizacji projektu: -złożenie wniosku o do?nansowanie -podpisanie umowy o do?nansowanie -wybór wykonawcy zgodnie z PZP -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harmonogramem -promocja projektu -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie projektu Sposób wdrażania zakresu rzeczowego: -podpisanie umowy -realizacja prac/wdrożenia -odbiór końcowy i podpisanie prot. Projekt wpisuje się w założenia określone w SzOOP RPO WWM 2014-2020 realizując założony cel tematyczny 6: Zachowanie i ochrona środowiska oraz promowanie efektywnego gospodarowania zasobami, Priorytet inwestycyjny 6c – Zachowanie, ochrona, promocja i rozwój dziedzictwa naturalnego i kulturowego. Przedmiotem projektu jest utworzenie szlaku rowerowego. Szlak rowerowy umożliwi promocje i rozwój dziedzictwa naturalnego Powiatu Szczycieńskiego . (Polish)
    0 references
    The subject of the project is the construction of a bicycle path on the area of the inactive Szczytno-Biskupiec railway line in the Municipality Szczytno and Szczytno commune. The project plans to: — construction of a bidirectional cycle path – roadway with bituminous surface of 3.0 m wide, – making two downhills from embankments in km 6 + 650.50 and in km 7 + 760.50 – downhills have a broken aggregate surface – conservation of greenery, ditches and culverts under the embankment and along the path – apart from the cycle path with bituminous masquerade and stripes of grasslands, there are available bushes and free grasslands. — overhaul of the brick overpass in km 6+ 482 – overhaul of the steel overpass in km 7+ 671 – construction of a service space for cyclists – the place of service of cyclists consists of a world, 2 trash cans, racks for 12 bicycles, table and benches, and an information board. Stages of project implementation: —submission of the application for funding – signing of the contract for financing – selection of the contractor in accordance with the PHP -conclusion of the contract with the contractor and commencement of works -implementation of works according to the established schedule -promotion of the project -promotion of the project and signing of the final protocol – final settlement of the project Method of implementation of the material scope: —conclusion of the contract -implementation of works/implementation -final reception and signing of the minutes. The project fits into the assumptions set out in the RPO WWM 2014-2020 SzOOP implementing the assumed thematic objective 6: Preserving and protecting the environment and promoting resource efficiency, investment priority 6c – Conservation, protection, promotion and development of natural and cultural heritage. The object of the project is the creation of a bicycle trail. The cycling trail will enable promotion and development of the natural heritage of Szczycieński County. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.06.02.03-28-0016/17
    0 references