Armament of the investment area for the company Stawiska Recreation (Q130246)

From EU Knowledge Graph
Revision as of 18:40, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q130246 in Poland
Language Label Description Also known as
English
Armament of the investment area for the company Stawiska Recreation
Project Q130246 in Poland

    Statements

    0 references
    273,058.72 zloty
    0 references
    65,534.09 Euro
    13 January 2020
    0 references
    570,059.96 zloty
    0 references
    136,814.39 Euro
    13 January 2020
    0 references
    47.9 percent
    0 references
    11 January 2018
    0 references
    31 December 2019
    0 references
    STAWISKA REKREACJA MARZENA ATŁAS, MARTA KOTOWSKA-SOKOŁOWSKA SPÓŁKA CYWILNA
    0 references
    0 references
    W ramach przedmiotowego Projektu zostanie przygotowany i uzbrojony teren pod przyszła inwestycję w przedsiębiorstwie Stawiska Rekreacja Marzena Atłas, Marta Kotowska-Sokołowska s.c. w Elblagu. Teren, którego dotyczy projekt znajduje się w Elblągu, przy ul.Kościuszki 134a, jego powierzchnia wynosi 0,8166ha. Zakres projektu: 1. Uporządkowanie terenu, w tym m.in.: niwelacja terenu, mury oporowe, wycinka drzew, uporządkowanie i oczyszczenie terenu. 2. Uzbrojenie terenu w zewnętrzne instalacje: • instalacja wodociągowa (roboty ziemne, roboty montażowe) • instalacja kanalizacji sanitarnej (roboty ziemne, roboty montażowe) • instalacja kanalizacji deszczowej (roboty ziemne, roboty montażowe) • instalację elektroenergetyczną (roboty ziemne, roboty montażowe) . 3. Przebudowa i budowa wewnętrznego układu komunikacyjnego (drogi wewnętrze, chodniki, parkingi) – powierzchnia 2.212,9m2. Projekt będzie wdrażany etapami, które są tożsame z zakresem projektu. Rozpoczęcie prac przewiduje się I kw 2018r., zakończenie - IV kw 2019r. Wykonanie Projektu jest niezbędne, z punktu widzenia realizacji przyszłej inwestycji: budowy centrum rekreacyjno-sportowego z zapleczem gastronomicznym w przedsiębiorstwie Stawiska Rekreacja s.c. w Elblągu. Inwestycja umożliwi rozwój firmy poprzez możliwość rozpoczęcia świadczenia kompleksowych usług rekreacyjno-sportowych, które do tej pory nie mogły być świadczone z uwagi na brak odpowiedniej infrastruktury. Dzięki tym działaniom wzrośnie konkurencyjność przedsiębiorstwa co wpisuje się w założenia opisane w SZOOP WiM Oś 1 cel tematyczny 3. Analiza formalno-prawna potwierdza pełną wykonalność inwestycji. Przedsięwzięcie będzie finansowane ze środków własnych spółki (52,1%) oraz dotacji (47,9%). (Polish)
    0 references
    As part of this project, the site will be prepared and armed for future investment in the company Stawiska Recreacja Marzena Atłas, Marta Kotowska-Sokołowska s.c. in Elblag. The area covered by the project is located in Elbląg, at ul.Kościuszki 134a, its area is 0.8166 ha. Scope of the project: 1. Tidying up the area, including: land levelling, resistance walls, tree cutting, order and clean-up. 2. Equipping the site with external installations: • water supply system (ground robots, assembly works) • sanitary sewerage installation (ground robots, assembly works) • rainwater drainage system (ground robots, assembly works) • power installation (ground robots, assembly works). 3. Reconstruction and construction of the internal communication system (internal roads, sidewalks, parking lots) – area of 2212.9 m². The project will be implemented in stages which are identical to the scope of the project. The start of work is planned for the first quarter of 2018, completion of the fourth quarter of 2019. The implementation of the Project is necessary from the point of view of the realisation of the future investment: construction of a recreational and sport centre with catering facilities in the company Stawiska Recreation s.c. in Elbląg. The investment will enable the company to develop through the possibility to start providing comprehensive recreational and sports services, which so far could not be provided due to the lack of adequate infrastructure. Thanks to these measures, the company’s competitiveness will increase, which is in line with the assumptions described in SZOOP WiM Axis 1 thematic objective 3. Formal and legal analysis confirms the full feasibility of the investment. The project will be financed from the company’s own resources (52.1 %) and grants (47.9 %). (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.01.03.04-28-0029/17
    0 references