Children’s group — Babice nad Svitavou (Q55538)

From EU Knowledge Graph
Revision as of 10:08, 26 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project will operate a children group with a capacity of 12 children. The place of implementation of the project will be Babice nad Svitavod140, 664 01 and the expected opening hours will be from 8: 00 to 16: 00 hours. The construction phase will start from 1.7.2019 and will take place up to 31.8.2019, i.e. 2 months. As a result, the operational phase, which will last for 5 semester, will be starting from 1.9.2019, i.e. up to 28.2.2022. The...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Children’s group — Babice nad Svitavou
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,026,890.8 Czech koruna
    0 references
    121,075.632 Euro
    10 January 2020
    0 references
    3,561,048.0 Czech koruna
    0 references
    142,441.92 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    1 July 2019
    0 references
    28 February 2022
    0 references
    Obec Babice nad Svitavou
    0 references
    0 references

    49°15'30.82"N, 16°41'4.13"E
    0 references
    66401
    0 references
    V rámci projektu bude provozována dětská skupina s kapacitou 12 dětí. Místem realizace projektu bude adresa Babice nad Svitavou 140, 664 01 a předpokládaná otevírací doba bude od 8:00 do 16:00 hod. Fáze vybudování bude zahájena od 1.7.2019 a bude probíhat až do 31.8.2019, tedy 2 měsíce. Následně bude od 1.9.2019 zahájena provozní fáze, která potrvá 5 pololetí, tedy do 28.2.2022. Zařízení bude určeno pro širokou veřejnost a bude provozováno na základě zákona o dětské skupině. (Czech)
    0 references
    The project will operate a children group with a capacity of 12 children. The place of implementation of the project will be Babice nad Svitavod140, 664 01 and the expected opening hours will be from 8: 00 to 16: 00 hours. The construction phase will start from 1.7.2019 and will take place up to 31.8.2019, i.e. 2 months. As a result, the operational phase, which will last for 5 semester, will be starting from 1.9.2019, i.e. up to 28.2.2022. The facility will be addressed to the general public and will be operated under the Child Group Act. (English)
    0 references

    Identifiers

    CZ.03.1.51/0.0/0.0/19_111/0014186
    0 references