Improving the quality and accessibility of education at the general level through the expansion and reconstruction of the John Paul II Secondary School – Sisters of Presents in Rzeszów (Q119334)

From EU Knowledge Graph
Revision as of 15:36, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q119334 in Poland
Language Label Description Also known as
English
Improving the quality and accessibility of education at the general level through the expansion and reconstruction of the John Paul II Secondary School – Sisters of Presents in Rzeszów
Project Q119334 in Poland

    Statements

    0 references
    994,193.11 zloty
    0 references
    238,606.35 Euro
    13 January 2020
    0 references
    2,426,044.75 zloty
    0 references
    582,250.74 Euro
    13 January 2020
    0 references
    40.98 percent
    0 references
    24 July 2015
    0 references
    31 March 2017
    0 references
    ZGROMADZENIE PANIEN OFIAROWANIA NAJŚWIĘTSZEJ MARYI PANNY
    0 references
    0 references
    Potrzeba realizacja niniejszego projektu wynika z analizy problemów, z jakimi boryka się jedna z najlepszych w województwie szkół kształcących na poziomie ogólnym – Liceum Ogólnokształcące im. Jana Pawła II – Sióstr Prezentek. Głównymi problemami, które niniejszy projekt stara się rozwiązać, są: • Zbyt mała powierzchnia dydaktyczna • Niski dostęp dzieci i młodzieży do nowoczesnej i dobrze wyposażonej infrastruktury sportowej oraz dydaktycznej (ograniczony dostęp uczniów do nowoczesnej infrastruktury (ICT) , materiałów edukacyjnych, sprzętu) • Brak możliwości realizacji alternatywnych, aktywnych form spędzania czasu wolnego dzieci i młodzieży z możliwością kreowania kompetencji istotnych dla rynku pracy, gospodarki opartej na wiedzy Celem niniejszego projektu jest wzrost dostępności oraz jakości i atrakcyjności oferty edukacyjnej na poziomie ogólnym w mieście Rzeszowie, poprzez rozbudowę istniejącego obiektu Liceum Ogólnokształcącego. Cel ten zostanie zrealizowany poprzez następujący zakres rzeczowy projektu: - - rozbudowę istniejącego obiektu o nowe skrzydło, - dostosowanie obiektu do potrzeb osób niepełnosprawnych – montaż windy, umożliwiającej dotarcie na każdą kondygnację nowej oraz istniejącej części szkoły, - przygotowanie pomieszczenia, stanowiącego przedłużenie istniejącej Sali gimnastycznej, w której będzie sala do ćwiczeń (fitness) + siłownia, - dostawa sprzętu ICT w celu unowocześnienia działalności placówki, - dostawa pomocy dydaktycznych na potrzeby pracowni fizyki. W wyniku projektu powierzchnia użytkowa obiektu zwiększy się o 670,99 m2 a kubatura o 2 689 m3, docelowe parametry odpowiednio: 3 915,03 m2 oraz 12 724 m2. Projekt realizowany jest w partnerstwie z Fundacją Akademia Szczęśliwej Rodziny - udział partnera w projekcie polega na wniesieniu zasobów ludzkich, wiedzy i doświadczenia - posiada charakter niefinansowy. Rezultatem projektu będzie wzrost liczby miejsc w szkole o 10 uczniów, zapewniając miejsca łącznie dla 447 uczniów. (Polish)
    0 references
    The need to implement this project stems from the analysis of the problems faced by one of the best schools in the voivodship that educate on the general level – John Paul II Secondary School – Sisters of Presents. The main problems this project seeks to address are: • Too small educational space • Low access for children and young people to modern and well-equipped sports and teaching infrastructure (limited access of pupils to modern infrastructure (ICT), educational materials, equipment) • Inability to implement alternative, active forms of leisure time for children and young people with the possibility of creating competences relevant to the labour market, knowledge-based economy The aim of this project is to increase the availability and quality and attractiveness of educational offer at the general level of the city. This objective will be achieved through the following material scope of the project: — – extension of the existing facility with a new wing, – adaptation of the facility to the needs of people with disabilities – installation of an elevator, enabling access to each floor of the new and existing part of the school, – preparation of the room, which is an extension of the existing gym, in which there will be a fitness room + gym, – delivery of ICT equipment to modernise the activity of the facility, – delivery of teaching aid for the needs of the physics studio. As a result of the project, the usable area of the facility will increase by 670.99 m² and the volume by 2689 m³, the target parameters respectively: 3915.03 m² and 12724 m². The project is implemented in partnership with the Foundation The Happy Family Academy – the participation of a partner in the project involves the provision of human resources, knowledge and experience – has a non-financial character. The project will result in an increase in the number of places in the school by 10 pupils, providing seats for a total of 447 pupils. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.06.04.03-18-0076/16
    0 references