Thermal modernisation of the building of the Public Primary School in Kamień Śląski. (Q114900)

From EU Knowledge Graph
Revision as of 14:23, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q114900 in Poland
Language Label Description Also known as
English
Thermal modernisation of the building of the Public Primary School in Kamień Śląski.
Project Q114900 in Poland

    Statements

    0 references
    612,669.45 zloty
    0 references
    147,040.67 Euro
    13 January 2020
    0 references
    1,134,573.08 zloty
    0 references
    272,297.54 Euro
    13 January 2020
    0 references
    54.0 percent
    0 references
    23 December 2015
    0 references
    31 December 2017
    0 references
    GMINA GOGOLIN
    0 references
    0 references
    Przedmiotem projektu jest głęboka i kompleksowa modernizacja energetyczna 1 budynku użyteczności publicznej: Publicznej Szkoły Podstawowej w Kamieniu Śląskim w celu zwiększenia efektywności energetycznej. Poprzez działania projektu nastąpi istotne zwiększenie racjonalności i wykorzystania energii cieplnej i elektrycznej w budynku o znacznej roli społecznej, jaką jest edukacja. Planowana modernizacja budynku to m.in.: ocieplenie ścian,stropów, modernizacja 1instalacji grzewczej i ciepłej wody użytkowej wraz z instalacją 1OZE- pompy ciepła na potrzeby dogrzewania wody użytkowej, jak również kompleksowa wymiana oświetlenia oraz wdrożenie systemu zarządzania energią w budynku. W wyniku projektu zwiększy się efektywność energetyczna oraz ograniczy zapotrzebowanie na energię w budynku. Oszczędność energii wynikająca z audytu energetycznego, w odniesieniu do stanu początkowego, dla energii końcowej wynosi: 63,5%. W ramach projektu zainstalowana zostanie tzw. zielona ściana, która będzie pełniła zarówno rolę izolacyjną, jak i edukacyjną w zakresie przedmiotów przyrodniczych. Okres zwrotu inwestycji: 18,99lat. W wyniku projektu zapewniony będzie podjazd dla ON-powstanie 1 obiekt dostosowany do potrzeb ON,1 projekt, gdzie sfinansowano usprawnienia dla ON. Materialne efekty przedsięwzięcia mierzone konkretnymi wielkościami prezentują się następująco: Liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami: 1szt. Liczba projektów, w których sfinansowano koszty racjonalnych usprawnień dla osób z niepełnosprawnościami: 1szt. Liczba zmodernizowanych energetycznie budynków: 1 szt. Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE: 1 szt. Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych: 001 MWt Powierzchnia użytkowa budynku poddanego termomodernizacji: 2791,04 m2 Liczba zmodernizowanych źródeł ciepła: 1szt. (Polish)
    0 references
    The subject of the project is a deep and comprehensive energy modernisation of 1 public utility buildings: Public Primary School in Kamień Śląski to increase energy efficiency. The project will significantly increase the rationality and use of heat and electricity in a building with a significant social role of education. The planned modernisation of the building includes: insulation of walls, ceilings, modernisation of 1 heating and hot water installations together with the installation of 1RES- heat pump for the purpose of water heating, as well as comprehensive lighting exchange and implementation of the energy management system in the building. The project will increase energy efficiency and reduce energy demand in the building. The energy savings resulting from the energy audit, in relation to the initial state, for final energy shall be: IT’S 63.5 %. As part of the project, the so-called green wall will be installed, which will perform both insulating and educational roles in the field of natural objects. Period of return on investment: 18 and a half years. As a result of the project, there will be a driveway for ON-establishing 1 object tailored to the needs of ON,1 project, where improvements for ON were financed. The material effects of the project measured by specific sizes are as follows: Number of facilities adapted to the needs of people with disabilities: It’s 1 pieces. Number of projects which financed the costs of rational improvement for people with disabilities: It’s 1 pieces. Number of energy-efficient buildings: 1 pcs Number of built units of heat generation from RES: 1 pcs Additional capacity to generate heat from renewable sources: 001 MWt The usable area of the building undergoing the thermal modernisation: 2791,04 m² Number of upgraded heat sources: It’s 1 pieces. (English)
    20 October 2020
    0 references

    Identifiers

    RPOP.03.02.02-16-0016/17
    0 references