Reconstruction and extension of the sewage treatment plant in Suchowola (Q117136)

From EU Knowledge Graph
Revision as of 14:20, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q117136 in Poland
Language Label Description Also known as
English
Reconstruction and extension of the sewage treatment plant in Suchowola
Project Q117136 in Poland

    Statements

    0 references
    2,844,866.9 zloty
    0 references
    682,768.06 Euro
    13 January 2020
    0 references
    3,346,902.24 zloty
    0 references
    803,256.54 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 February 2016
    0 references
    11 June 2021
    0 references
    CENTROKOM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°34'43.0"N, 23°6'20.9"E
    0 references
    Podstawowym problemem związanym z funkcjonowaniem oczyszczalni ścieków w Suchowoli jest jej przestarzała technologia pracy oraz braki w zakresie skutecznego systemu kontroli i monitoringu jakości oczyszczonej wody. Obiekt został wybudowany w latach 90-tych XX w. i od momentu oddania do użytkowania przeszedł większą przebudowę dopiero w 2009 roku. Podjęte wtedy działania miały jednak charakter doraźny i obecnie konieczne jest przeprowadzenie kolejnej inwestycji. W ramach przedsięwzięcia przewidziano: * rozbudowę budynku technologicznego o bezpośrednio przylegający boks składowy (wiatę osadu) oraz wykonanie jego nowej elewacji wraz z ociepleniem ścian zewnętrznych i dachu budynku, wymianę stolarki okiennej i drzwiowej, a także wykonanie fundamentów pod maszyny, nowych posadzek i malatury, * adaptację dwóch istniejących komór do celów stabilizacji tlenowej osadu nadmiernego i zbiornika retencyjnego ścieków, * przebudowę istniejących rurociągów technologicznych grawitacyjnych i ciśnieniowych, * modernizację technologii oczyszczalni, przede wszystkim jej uzupełnienie w zakresie odwadniania i higienizacji osadów, * wykonaniu ciągów komunikacyjnych i placów manewrowych o nawierzchni utwardzonej z kostki betonowej do obsługi budynku technologicznego. Beneficjent jest przygotowany do realizacji projektu – posiada tytuł prawny do nieruchomości, jak również uzyskał wszystkie niezbędne pozwolenia. Ponadto wszczęto postępowanie konkurencyjne zmierzające do wyłonienia wykonawcy robót. Przedsięwzięcie jest zgodne z dyrektywą 91/271/EWG, a także Master Planem dla wdrażania tejże dyrektywy, opracowanym na podstawie AKPOŚK 2017. (Polish)
    0 references
    The main problem with the operation of the sewage treatment plant in Suchowola is its outdated work technology and shortcomings in the effective system of control and monitoring of the quality of purified water. The building was built in the 90s, and since its completion it has undergone a major reconstruction only in 2009. However, the measures taken at that time were ad hoc and a further investment is now necessary. The project envisages: * the expansion of the technological building with a directly adjacent component box (the world of the sediment) and its new facade with the warming of the outer walls and the roof of the building, the replacement of the window and door carpentry, as well as the construction of foundations for the machine, new floors and malature, * adaptation of the existing technologies of the building for the purpose of oxygen stabilisation of excessive sludge and storage tank, * reconstruction of existing technological pipelines of gravity and pressure, etc. The beneficiary is prepared to carry out the project – holds a legal title to the real estate and has obtained all the necessary permits. In addition, a competitive procedure was initiated to select the contractor for the works. The project complies with Directive 91/271/EEC, as well as the Master Plan for the implementation of that Directive, drawn up on the basis of the ACPPACE 2017. (English)
    20 October 2020
    0 references

    Identifiers

    RPPD.06.02.00-20-0033/19
    0 references