Project Q112606 in Poland
Language Label Description Also known as
English
“Construction of the Municipal Waste Collection Selective Point on Dz. or. No. 1386/10”
Project Q112606 in Poland

    Statements

    0 references
    1,327,439.51 zloty
    0 references
    318,585.48 Euro
    13 January 2020
    0 references
    1,561,693.57 zloty
    0 references
    374,806.46 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 September 2018
    0 references
    31 December 2019
    0 references
    PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ SP. Z O. O. W MUSZYNIE
    0 references
    0 references
    Przedmiotem projektu jest Budowa Punktu Selektywnej Zbiórki Odpadów Komunalnych na działce nr ew. 138610 Muszyna.Projekt obejmuje 3 zadania:Zadanie 1 prace budowlane i zakup wyposażenia,Zadanie 2 pracę inspektorów nadzoru budowlanego,Zadanie 3 Promocję projektu i przeprowadzenie akcji podniesienia świadomości ekologicznej.W ramach zadania 1 planuje się: budowę 2 wiat jedna z trzema obiektami: 1.2, 1.3, 1.4 i jedna z obiektem GPZON, 12 otwartych stanowisk kontenerowych obiekt 1.5 oraz jednego placu utwardzonego do przeładunku odpadów komunalnych, zakup kontenerów 27 szt. poj. 7 m3, 7 szt. 36 m3.Przyjęte w projekcie rozwiązania są zgodne z najlepszymi rozwiązaniami w dziedzinie gospodarki odpadami, zastosowano rozwiązania projektowe optymalne dla zagospodarowania dostępnego terenu oraz gwarantujące prawidłową wycenę nakłądów inwestycyjnych. Przyjęte rozwiązania w sposób jednoznaczny odpowiadają na rozwiązanie problemów związanych z gospodarką śmieciową w Gminie Muszyna.Przedstawiony opis jednoznacznie potwierdza, że projekt związany jest z budową PSZOK. Przyjęte w projekcie rozwiązania są zgodne z najlepszą praktyką w dziedzinie budowy PSZOK, zaprojektowane w sposób maksymalny wykorzystanie dostępnych technologii. Szczegółowy opis projektu zawiera dołączony do wniosku projekt budowlany oraz specyfikacja wyposażenia. Koszty inwestycji sporządzono na podstawie kosztorysów inwestorskich, które dołączono do wniosku. Projekt dotyczy budowy nowego PSZOK.Całkowity koszt projektu to 1 920 883,09 zł brutto, w tym VAT 359 189,52 zł.Koszty kwalifikowane przedstawia poniższa tabela:I.Budowa Punktu Selektywnej Zbiórki Odpadów Komunalnych na działce nr ew. 138610 Muszyna, w tym:1 526 693,57II.Inspektor nadzoru budowlanego30 000,00III.Akcja podniesienia świadomości ekologicznej5 000,00 NAKŁADY RAZEM1 561 693,57 (Polish)
    0 references
    The project covers 3 tasks:Task 1 construction works and purchase of equipment, Task 2 work of building supervising inspectors, Task 3 Project promotion and carrying out environmental awareness actions. construction of 2 world one with three facilities: 1.2, 1.3, 1.4 and one with the GPZON facility, 12 open container stations facility 1.5 and one square paved for the handling of municipal waste, purchase of containers 27 pieces of storage. 7 m³, 7 pcs. 36 m³.The solutions adopted in the project are consistent with the best solutions in the field of waste management, optimal design solutions for the development of available land and guarantee a correct valuation of investment outlays. The solutions adopted unambiguously respond to the solution of problems related to waste management in the Muszyna Municipality.The description presented clearly confirms that the project is related to the construction of PSZOK. The solutions adopted in the project are in line with best practice in the field of construction of PSZOK, designed to maximise the use of available technologies. A detailed description of the project includes the attached construction design and the equipment specification. The cost of the investment was based on the investor’s estimates, which were attached to the proposal. The project concerns the construction of the new PSZOK.The total cost of the project is PLN 1 920 883.09 gross, including VAT 359 189.52 PLN.Qualified costs are presented in the following table:I.Construction of the Municipal Waste Collection Point on land no. 138610 Muszyn, including:1 526 693.57II.Construction inspector of construction supervision30 000,00III.Action to raise environmental awareness5 000,00 NAKLE 561,57EM (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.05.02.02-12-0497/17