Construction and modernisation of the water treatment and water collection infrastructure of the water station in Wólka Łańcuchowska, Gm. Milejów (Q105691)

From EU Knowledge Graph
Revision as of 09:59, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q105691 in Poland
Language Label Description Also known as
English
Construction and modernisation of the water treatment and water collection infrastructure of the water station in Wólka Łańcuchowska, Gm. Milejów
Project Q105691 in Poland

    Statements

    0 references
    499,116.5 zloty
    0 references
    119,787.96 Euro
    13 January 2020
    0 references
    587,195.91 zloty
    0 references
    140,927.02 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    24 November 2015
    0 references
    31 July 2018
    0 references
    GMINA MILEJÓW
    0 references
    Głównym celem projektu jest zwiększenie dostępności (szczególnie w przypadku suszy) wody dla odbiorców indywidualnych oraz poprawa jakości wód dostarczanych na cele socjalno - bytowe i przemysłowe poprzez budowę i modernizację infrastruktury uzdatniania i poboru wody stacji wodociągowej w Wólce Łańcuchowej, gm. Milejów. Na zakres projektu składa się budowa i modernizacja infrastruktury uzdatniania i poboru wody stacji wodociągowej w Wólce Łańcuchowskiej w Gminie Milejów. Celem szczegółowym projektu jest poprawa warunków życia mieszkańców Gminy Milejów oraz warunków działania przedsiębiorców lokalnych poprzez działania mające na celu zniesienie utrudnień związanych z użytkowaniem sieci wodociągowej szczególnie w okresach suszy i niedoborów wody. Jest to szczególnie istotne, gdyż główne przedsiębiorstwa na terenie Gminy Milejów są wysoce wodochłonne (przetwórstwo rolno-spożywcze). Realizacja celu głównego i szczegółowego zapewni poprawę jakości życia mieszkańców oraz wpłynie pozytywnie na ochronę środowiska naturalnego poprzez znaczące ograniczenie strat wody. Zapewnienie stabilnej i nieprzerwanej pracy sieci wodociągowej zmniejszy ryzyka chorób ludzi w Gminie Milejów spowodowanych złą jakością dostarczanej wody. Tak skonstruowany cel projektu w największym stopniu odpowiada zidentyfikowanym w ramach przeprowadzonych analiz problemom zarówno głównym jak i szczegółowym. W ramach inwestycji realizowane będą następujące zadania: budowa zbiornika wyrównawczego 100 m3, rozbudowa/przebudowa budynku ujęcia wody, aerator, chlorator, kompleksowa przebudowa centrali energetycznej i całej instalacji elektrycznej w obiekcie (w tym instalacji PV), zagospodarowanie terenu, w tym budowa zbiornika bezodpływowego, systemy monitoringu, dokumentacja projektowa w tym koncepcja architektoniczna, studium wykonalności, zarządzanie projektem, nadzór inwestorski, promocja. Realizacja wszystkich zaplanowanych zadań umożliwi osiągnięcie kluczowych rezultatów projektu i realizację celu głównego (Polish)
    0 references
    The main objective of the project is to increase the availability (especially in the event of drought) of water to individual customers and to improve the quality of water supplied for social and industrial purposes through the construction and modernisation of the water treatment and water abstraction infrastructure of the water supply station in Wólka Chainowa, Gm. Milejów. The scope of the project consists of the construction and modernisation of the water treatment and water collection infrastructure of the water supply station in Wólka Łańcuchowska in the Milejów Municipality. The specific objective of the project is to improve the living conditions of residents of Milejów Municipality and the conditions of operation of local entrepreneurs through actions aimed at removing obstacles related to the use of water supply networks, especially during periods of drought and water scarcity. This is particularly important, as the main companies in Milejów Municipality are highly water-intensive (agri-food processing). Achieving the main and specific objective will improve the quality of life of residents and have a positive impact on environmental protection by significantly reducing water losses. Ensuring stable and continuous operation of the water supply system will reduce the risk of human diseases in the Miley Village due to poor quality of water supplied. The project’s objective thus designed best corresponds to the main and specific problems identified in the analysis. The following tasks will be carried out within the framework of the investment: construction of a 100 m³ compensatory tank, extension/reconstruction of water intake building, aerator, chlorator, complex reconstruction of the power centre and the entire electrical installation in the facility (including PV installation), land development, including the construction of a waste water tank, monitoring systems, project documentation including architectural concept, feasibility study, project management, investor supervision, promotion. Implementation of all planned tasks will enable the key project results to be achieved and the main objective to be achieved (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.06.04.00-06-0070/15
    0 references