Thermal modernisation of the School Complex building in Dąbrowa Huta (Q105393)

From EU Knowledge Graph
Revision as of 11:46, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q105393 in Poland
Language Label Description Also known as
English
Thermal modernisation of the School Complex building in Dąbrowa Huta
Project Q105393 in Poland

    Statements

    0 references
    784,053.64 zloty
    0 references
    188,172.87 Euro
    13 January 2020
    0 references
    922,416.07 zloty
    0 references
    221,379.86 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    6 July 2017
    0 references
    30 September 2019
    0 references
    GMINA KRZYWDA
    0 references
    0 references
    Celem głównym projektu jest ograniczenie zużycia energii finalnej w budynku o 375,417 MWh/rok tj.67,76% . Kluczowe rezultaty realizacji projektu to:Ilość zaoszczędzonej energii cieplnej-1352 GJ/rok, Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych o 412959 kWh/rok, Szacowany roczny spadek emisji gazów cieplarnianych o 75,819 ton równoważnika CO2 (tj. 66%) oraz ograniczenie kwaśnych emisji do atmosfery (SO2, NOx) o 70%. Grupa docelowa obejmuje użytkowników budynku: 63 uczniów w przedszkolu, 220 uczniów szkoły podstawowej, 80 uczniów gimnazjum, 38 nauczycieli oraz 17 pracowników obsługi. Grupę docelową stanowi również Gmina Krzywda, która ponosi koszty utrzymania obiektu oraz mieszkańcy regionu, dla których polepszy się jakość powietrza. Zadania przewidziane do realizacji obejmują termomodernizację budynku o zakresie: -Ocieplenie ścian zewnętrznych budynku, -Ocieplenie dachu sali gimnastycznej i łącznika, -Ocieplenie stropodachu z przestrzenią wentylowaną, -Wymiana okien na okna o współczynniku U nie wyższym jak 0,9 oraz montaż nawiewników higrosterowanych, -Wymiana drzwi wejściowych na drzwi o współczynniku U nie większym niż 1,3, -Modernizacja instalacji c.o.: wymiana całej instalacji c.o. . Nowa instalacja powinna posiadać termozawory grzejnikowe o czułości nie większej jak 1°C , oraz monitoring zdalnego sterowania pracą kotła o połączeniu WiFi lub GSM oraz opomiarowanie kotłowni. Projekt obejmuje swoim zakresem również działania nieinwestycyjne, takie jak: przygotowanie dokumentacji projektowej, audytu energetycznego, studium wykonalności nadzór inwestorski oraz promocję projektu. (Polish)
    0 references
    The main objective of the project is to reduce final energy consumption in the building by 375.417 MWh/year, i.e.67.76 %. The key results of the project are:The amount of heat savings – 1352 GJ/year, Reduction of annual primary energy consumption in public buildings by 412959 kWh/year, estimated annual reduction in greenhouse gas emissions by 75.819 tonnes CO2 equivalent (i.e. 66 %) and reduction of acidic emissions into the atmosphere (SO2, NOx) by 70 %. The target group shall include the users of the building: 63 students in kindergarten, 220 primary school students, 80 middle school students, 38 teachers and 17 service staff. The target group is also the Municipality of Krzywda, which bears the costs of maintaining the facility and the inhabitants of the region, for whom air quality will improve. The tasks to be carried out include the thermal modernisation of the building with the scope of: —Warming of the exterior walls of the building, -Warming of the roof of the gym and connector, -Hotification of the ceiling with ventilated space, -Replacement of windows with a U coefficient of no higher than 0.9 and installation of hygrosterated vents, -Replacement of entrance doors for doors with a U coefficient of no more than 1,3, -Modernisation of the central heating system: replacement of the entire central heating system. The new installation should include radiator thermos with a sensitivity of not more than 1 °C, and monitoring remote control of a boiler with WiFi or GSM connection and measuring the boiler room. The project also covers non-investment activities such as: preparation of project documentation, energy audit, feasibility study investor supervision and promotion of the project. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0078/17
    0 references