Improving the energy efficiency of school buildings in the area of Międzyrzec Podlaski (Q105435)

From EU Knowledge Graph
Revision as of 11:40, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q105435 in Poland
Language Label Description Also known as
English
Improving the energy efficiency of school buildings in the area of Międzyrzec Podlaski
Project Q105435 in Poland

    Statements

    0 references
    3,576,843.98 zloty
    0 references
    858,442.56 Euro
    13 January 2020
    0 references
    4,208,051.75 zloty
    0 references
    1,009,932.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    14 January 2019
    0 references
    15 December 2022
    0 references
    GMINA MIĘDZYRZEC PODLASKI
    0 references
    Gł. celem P.: Poprawa jakości środowiska naturalnego na terenie Gm. MP wpływająca na wzrost jakości życia społeczności lokalnej oraz zwiększenie konkurencyjności obszaru. C.szczegół. są: 1.Zoptymalizowanie działań zwiększających efektywność energ. sektora publ., 2.Łagodzenie zmian klimatu poprzez ogran. emisji zanieczyszczeń do atmosfery, 3.Zwiększenie wykorzystania energii pochodzącej z OZE. Grupa docel.: użytk. budynku PSP w Kożuszkach, Jelnicy, Rzeczycy, Misiach i Halasy (uczniowie i kadra nauczycielska i obsł. budynku), mieszkańcy i podm. funkcjon. na terenie Gm. MP. Proj. obej. kompleksową termomodernizację bud. publ. o łącznej pow. użytkowej9816,9 m2. Rezultaty: Ilość zaoszczędzonej e. cieplnej-1750,16GJ/rok; Ilość zaoszczędzonej e. elekt.-135,39 MWh/rok, Zmniejszenie rocznego zużycia e. pierwotnej ..(CI32)-748930,54kWh/rok; Szacowany roczny spadek ...(CI34)-197,69tCO2/rok; Produkcja e. cieplnej z instalacji wykorz. OZE -130,13MWht/rok; Prod.e. elektr. z OZE -24,42MWh/rok Dodat. zdolność wytwarzania energii OZE (CI30)-0,38MW. Produkty: Licz.zmoderniz. energetycznie bud.-5szt. Licz. wybudowanych jed. wytwarzania energii cieplnej-2szt.; Licz. wybudowanych jed.energii elektrycznej z OZE-3szt. Zakres prac obejmuje wykon. prac termomoderniz.: *PSP w Halasach: wymiana stolarki okiennej, pompa ciepła 150 kW; wymiana oświetlenia;syst.zarz.eneg. *PSP Jelnica; docieplenie stropu, wymiana stolarki okiennej i drzwiowej, modernizacja systemu grzewczego, wymiana istniejącego oświetlenia, *PSP w Kożuszkach: docieplenie stropu i ścian zewn., wymiana stolarki okiennej i drzwiowej, montaż pompy ciepła 200kW; wymiana istniejącego oświetlenia na LED; *montaż inst. fotowol. 5,12kW, *PSP w Rzeczycy: *modern. instalacji wentylacji, systemu grzewczego, wymiana istniejącego oświetlenia, montaż inst. fotowol.11,52kW; PSP w Misiach: moderniz. instalacji co.,wymiana oświetlenia LED, syst.zarz.eneg.,inst.foto.11,52 kW; zg. z audytami energet. efektywność energet. proj. wzrośnie o 61,68%. (Polish)
    0 references
    Aim P.: Improving the quality of the environment in the area of Gm. MP influencing the quality of life of the local community and increasing the competitiveness of the area. C.Details are: 1.Optimising measures to increase the efficiency of the energy sector publ., 2. Mitigating climate change through the emission of pollutants into the atmosphere, 3.Increasing the use of energy from RES. Target group: PSP building in Kożuszkoki, Jelnica, Rzeczycy, teddy and Halasa (pupils and teaching staff and staff of the building), residents and subm. functional. in the area of Gm. MP. The project includes comprehensive thermomodernisation of the building. publ. with a total usable area of 9816,9 m². Results: The amount of e. heat saved-1750,16GJ/year; Amount of saved e.el.-135,39 MWh/year, Reduction of annual primary e. consumption..(CI32)-748930,54 kWh/year; Estimated annual decrease...(CI34)-197,69tCO2/year; Production of e. heat from the extinguishing system. RES – 130,13MWht/year; Prod.e. electricity from RES -24,42 MWh/year Supplement. RES generation capacity (CI30)-0.38 MW. Products: Number. zmoderniz. energetic building.-5piece. Number of built-in heat energy generation – 2pcs; Number of built electric energy with RES-3pc. The scope of works includes the performance of thermomodernisation works: *PSP in noises: replacement of window carpentry, heat pump 150 kW; replacement of lighting;syst.zarz.eneg. *PSP Jelnica; floor warming, replacement of window and door carpentry, modernisation of heating system, replacement of existing lighting, *PSP in Kożuszki: warming of ceiling and exterior walls, replacement of window and door carpentry, installation of heat pump 200 kW; replacement of existing lighting with LED; *assembly inst. photovol. 5,12 kW, *PSP in the Thing: *modern. ventilation system, heating system, replacement of existing lighting, installation of photovol.11,52kW; PSP in teddy bears: modernising co. installation, replacement of LED lighting, syst.zarz.eneg.,inst.foto.11,52 kW; according to energet audits, the efficiency of energet. project will increase by 61.68 %. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0106/19
    0 references