Integrated Cycling Track System in the municipalities of Babimost, Kargowa and Zbąszynek (Q100356)

From EU Knowledge Graph
Revision as of 08:42, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q100356 in Poland
Language Label Description Also known as
English
Integrated Cycling Track System in the municipalities of Babimost, Kargowa and Zbąszynek
Project Q100356 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    9,899,998.88 zloty
    0 references
    2,375,999.73 Euro
    13 January 2020
    0 references
    13,726,402.04 zloty
    0 references
    3,294,336.49 Euro
    13 January 2020
    0 references
    72.12 percent
    0 references
    25 May 2016
    0 references
    31 December 2019
    0 references
    GMINA BABIMOST
    0 references

    52°14'36.6"N, 15°48'50.0"E
    0 references

    52°9'55.1"N, 15°49'42.6"E
    0 references

    52°4'18.8"N, 15°51'53.3"E
    0 references
    Przedmiotem projektu jest budowa sieci ścieżek rowerowych, które będą pełniły funkcję korytarzy transportowych, będących alternatywą dla innych środków transportu. Przedsięwzięcie to inwestycja drogowa polegająca na budowie ścieżek rowerowych. W ramach inwestycji przewiduje się w szczególności roboty budowlane w branżach: drogowej, mostowej, sanitarnej – odwodnienie dróg, elektroenergetycznej – oświetlenie dróg, konstrukcyjno-budowlanej – mała architektura. Ponadto, we wszystkich koniecznych przypadkach, będą wykonane roboty branżowe związane z usunięciem kolizji ścieżek rowerowych z infrastrukturą podziemną i naziemną. Inwestycja realizowana jest w partnerstwie: Gm. Babimost, Gm. Zbąszynek, Gm. Kargowa, Pow. Zielonogórski, Pow. Świebodziński. Inwestycja usytuowana jest w woj. lubuskim na terenie gmin partnerskich, tj.: gm. Babimost, gm. Zbąszynek, gm. Kargowa. W związku z tym, iż ścieżki rowerowe zaplanowano również przy drogach powiatowych, partnerami w proj. są również pow.: zielonogórski i świebodziński. Zakres inwestycji obejmuje budowę 8 ciągów ścieżek rowerowych o łącznej dł. ok. 22 082 m w tym na terenie gminy: Babimost: 9 230 m, Zbąszynek: 7 857 m, Kargowa: 4 996 m. Inwestycja realizowana w trybie „zaprojektuj i wybuduj”, tj. wyłoniony w przetargu wykonawca najpierw przygotuje pełną dokumentację projektową, a później na jej podstawie zrealizuje inwestycję. Poszczególne odcinki ścieżek łączą ze sobą poszczególne miejscowości; miejscowości z drogami krajowymi, wojewódzkimi i powiatowymi, przebiegają również odcinkowo wzdłuż tych dróg. Gł. celem projektu jest ograniczenie niskiej emisji zanieczyszczeń z sektora transportu poprzez rozwój infrastruktury rowerowej na terenie gmin: Babimost, Zbąszynek, Kargowa. Gr. docelowe: Mieszkańcy ww.gmin Inwestorzy i przedsiębiorcy Władze JST: gm. Babimost, gm. Zbąszynek, gm. Kargowa, pow. Zielonogórskiego, pow. Świebodzińskiego Instytucje systemu ochrony środowiska Okres realizacji proj.od 25.05.2016 (Polish)
    0 references
    The subject of the project is the construction of a network of bicycle paths, which will serve as transport corridors, which are an alternative to other modes of transport. The project is a road investment involving the construction of bicycle paths. In particular, the investment envisages construction works in the following sectors: road, bridge, sanitary – drainage of roads, electricity – illumination of roads, construction and construction – small architecture. In addition, in all cases necessary, industry work will be done to remove collisions of bicycle paths with underground and terrestrial infrastructure. The investment is carried out in partnership: GM. Babimost, Gm. Zbuszynek, Gm. Kargwa, Pow. Zielona Góra, Pow. It’s a freshman. The investment is located in lubuskie voivodship on the territory of partner municipalities, i.e.: Babimost, Gm. Zbuszynek, gm. Kargwa. Due to the fact that bicycle paths are also planned on district roads, partners in the project are also: Zielona Góra and Świbodziński. The scope of the investment includes the construction of 8 cycle tracks with a total length of approx. 22082 m including in the commune: Babimost: 9230 m, Bubbly: 7857 m, Kargowa: 4996 m. The investment carried out in the “design and build” mode, i.e. the contractor selected in the tender, will first prepare the complete project documentation, and then on the basis of it will implement the investment. The individual sections of the paths combine individual towns; villages with national, voivodeship and county roads, also run in sections along these roads. The aim of the project is to reduce low emissions of pollutants from the transport sector through the development of cycling infrastructure in municipalities: Babimost, Zbuszynki, Kargowa. Target: Investors and Entrepreneurs Authorities of JST: Babimost, Gm. Zbuszynek, gm. Kargwa, pow. Zielona Góra, pow. Świebodziński Environmental Protection System Institutions Period of project implementation since 25.05.2016 (English)
    16 October 2020
    0 references

    Identifiers

    RPLB.03.03.01-08-0004/17
    0 references