Thermal modernisation of the common room in the Poznań housing estate (Q100335)

From EU Knowledge Graph
Revision as of 08:35, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q100335 in Poland
Language Label Description Also known as
English
Thermal modernisation of the common room in the Poznań housing estate
Project Q100335 in Poland

    Statements

    0 references
    980,877.65 zloty
    0 references
    235,410.64 Euro
    13 January 2020
    0 references
    1,153,973.77 zloty
    0 references
    276,953.7 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 April 2017
    0 references
    25 July 2020
    0 references
    GMINA DESZCZNO
    0 references

    52°40'19.6"N, 15°18'34.6"E
    0 references
    Projekt dotyczy termomodernizacji budynku świetlicy wiejskiej w Osiedlu Poznańskim obejmującej: 1) termomodernizację (kwalif.) 2) pozostałe roboty (niekwalif.). Nakłady: 2 463 887,47 zł wnioskowane dof. 980 877,65 zł. Celem projektu jest zwiększenie efektywności energetycznej budynku użyteczności publicznej gminy Deszczno oraz zmniejszenie emisji zanieczyszczeń przedostających się do powietrza na terenie gminy Deszczno i okolic poprzez poprawę termoizolacyjności i zmniejszenie zapotrzebowania na energię budynku świetlicy wiejskiej w Osiedlu Poznańskim Roboty obejmą: docieplenie fundamentów, ścian i dachu, wymianę stolarki okiennej i drzwiowej, wykonanie wentylacji mechanicznej, modernizację instalacji CO i CWU oraz modernizację oświetlenia. Planowany zakres prac zmniejszy zapotrzebowanie obiektu na energię o 68,14%. Wnioskodawca posiada kompletną dokumentację techniczną, audyt energetyczny, studium wykonalności, niezbędne opinie, pozwolenia i uzgodnienia, PGN. Wnioskodawca posiada także zasoby i doświadczenie umożliwiające przeprowadzenie projektu. Zakres projektu nie kwalifikuje go do obowiązku przeprowadzenia OOŚ. Projekt nie wpływa na obszary Natura 2000, ekspertyza ornitologiczna wskazuje, że zakres nie będzie miał wpływu na siedliska ptaków i nietoperzy. Projekt pozytywnie wpłynie na realizację polityk horyzontalnych. Odpowiada na potrzeby grup docelowych, zachowa trwałość w okresie min. 5 lat od zakończenia zgodnie z rozporządzeniem Rady UE nr 1303. Projekt jest spójny z dokumentami strategicznymi, gminnym PGN i strategią ZIT GW. Projekt spełnia kryteria dostępu, merytoryczne i specyficzne osi priorytetowej III RPO. W drodze realizacji projektu osiągnięte zostaną następujące wskaźniki: - Liczba zmodernizowanych energetycznie budynków – 1 szt. - Liczba zmodernizowanych źródeł ciepła – 1 szt. - Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych (CI 32) – 287 450 kWh/rok - Szacowany roczny spadek emisji gazów cieplarnianych (CI 34) - 80[...] (Polish)
    0 references
    The project concerns the thermomodernisation of the rural common room building in the Poznańskie Estate, which includes: 1) Thermomodernisation (qualification) 2) other robots (non-qualified). Expenditures: 2 463 887,47 PLN requested DOF. 980 877,65 PLN. The aim of the project is to increase the energy efficiency of the public utility building of the municipality of Deszczno and to reduce emissions of pollutants entering the air in the Deszczno commune and its surroundings by improving thermal insulation and reducing the energy demand of the rural common room building in the Poznań Roboty Estate: warming of foundations, walls and roofs, replacement of window and door carpentry, mechanical ventilation, modernisation of CO and CWU installations and modernisation of lighting. The planned scope of work will reduce the energy demand of the facility by 68.14 %. The applicant shall have complete technical documentation, energy audit, feasibility study, necessary opinions, permits and arrangements, PGN. The applicant shall also have the resources and experience to carry out the project. The scope of the project does not qualify it for an EIA obligation. The project does not affect Natura 2000 sites, ornithological expertise indicates that the scope will not affect the habitats of birds and bats. The project will have a positive impact on the implementation of horizontal policies. Responds to the needs of target groups and will remain sustainable for a minimum period of 5 years after completion in accordance with Council Regulation No 1303. The project is consistent with strategic documents, municipal PGN and ZIT GW strategy. The project meets the criteria for access, substantive and specific priority axis III of ROP. The following indicators will be achieved through the implementation of the project: — Number of energy-upgraded buildings – 1 pieces. — Number of modernised heat sources – 1 pcs. — Reduction of annual primary energy consumption in public buildings (CI 32) – 287450 kWh/year – Estimated annual reduction in greenhouse gas emissions (CI 34) – 80[...] (English)
    16 October 2020
    0 references

    Identifiers

    RPLB.03.02.02-08-0005/18
    0 references