CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE MUNICIPALITY OF SŁAWNO IN KUNICE, PRYMUSOWA WILL, STONE AND CAUTIOUS (Q102022)

From EU Knowledge Graph
Revision as of 10:41, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q102022 in Poland
Language Label Description Also known as
English
CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE MUNICIPALITY OF SŁAWNO IN KUNICE, PRYMUSOWA WILL, STONE AND CAUTIOUS
Project Q102022 in Poland

    Statements

    0 references
    476,780.67 zloty
    0 references
    114,427.36 Euro
    13 January 2020
    0 references
    561,579.12 zloty
    0 references
    134,778.99 Euro
    13 January 2020
    0 references
    84.9 percent
    0 references
    1 February 2019
    0 references
    20 December 2019
    0 references
    GMINA SŁAWNO
    0 references
    0 references

    51°23'31.2"N, 20°8'23.6"E
    0 references
    PROJEKT POLEGA NA BUDOWIE OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH ZGODNIE Z KONCEPCJĄ PROJEKTOWANIA UNIWERSALNEGO WG WYTYCZNYCH FU 2014-2020 NA ODCINKACH: • KUNICE: 26 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED • PRYMUSOWA WOLA: 28 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED I 2 SZT. ZNAKÓW AKTYWNYCH ZASILANYCH Z MODUŁU FOTOWOLTAICZNEGO • KAMIEŃ: 62 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED • OSTROŻNA: 4 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED ŁĄCZNIE WYBUDOWANE ZOSTANĄ 120 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED ORAZ 2 ZNAKI AKTYWNE ZASILANE Z MODUŁU FOTOWOLTAICZNEGO (OZE) PLANOWANA INWESTYCJA JEST ELEMENTEM SZERSZEGO PROJEKTU INFRASTRUKTURALNEGO, RÓWNOLEGLE REALIZOWANEGO I FINANSOWANEGO PRZEZ BENEFICJENTA – WIĘCEJ W PKT. 6.6 WOD. OBECNE WYSOKIE KOSZTY OŚWIETLANIA MIEJSC UŻYTECZNOŚCI PUBLICZNEJ: • GENERUJĄ WYSOKIE KOSZTY OŚWIETLANIA • ZWIĘKSZAJĄ ZANIECZYSZCZANIE ŚRODOWISKA • WYSOKIE KOSZTY OŚWIETLANIA POWODUJĄ, IŻ NIE WZRASTA PROPORCJONALNIE DO POTRZEB LICZBA NOWYCH INWESTYCJI • ZWIĄZANE SĄ Z NIEWYKORZYSTANIEM SYSTEMÓW ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH (OZE). ZADANIA: 1. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI KUNICE. 2. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH W MIEJSCOWOŚCI PRYMUSOWA WOLA. 3. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI KAMIEŃ. 4. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI OSTROŻNA. 5. PROMOCJA PROJEKTU. 6. NADZÓR INWESTORSKI. 7. PRZYŁĄCZENIE DO SIECI DYSTRYBUCYJNEJ PGE SZCZEGÓŁOWE WYMAGANIA TECHNICZ. ZNAJDUJĄ SIĘ W SW ROZ. 4 ORAZ W ZAŁ. 3. CELE: DZIĘKI REALIZACJI PROJEKTU SPEŁNIONY ZOSTANIE CEL GŁÓWNY PROJEKTU TJ. ZWIĘKSZANIE OSZCZĘDNOŚCI ENERGII ORAZ POPRAWA CZYSTOŚCI POWIETRZA W GMINIE SŁAWNO. GRUPA DOCELOWA: BEZPOŚREDNIA: MIESZKAŃCY GMINY SŁAWNO, OSOBY PRZEJEZDNE, KORZYSTAJĄCE Z INFRASTRUKTURY P (Polish)
    0 references
    THE PROJECT CONSISTS OF THE CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT ACCORDING TO THE CONCEPT OF UNIVERSAL DESIGN ACCORDING TO FU 2014-2020 GUIDELINES ON SECTIONS: • KUNICE: 26 LIGHT POINTS WITH LED LUMINAIRES • PRIMUS WILL: 28 LIGHT POINTS WITH LED LUMINAIRES AND 2 PCS. ACTIVE CHARACTERS POWERED BY PHOTOVOLTAIC MODULE • STONE: 62 LIGHT POINTS WITH LED LUMINAIRES • CAUTIOUS: 4 LIGHT POINTS WITH LED LUMINAIRES WILL BE BUILT IN TOTAL 120 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE SIGNS POWERED FROM THE PHOTOVOLTAIC MODULE (RES) THE PLANNED INVESTMENT IS PART OF A WIDER INFRASTRUCTURE PROJECT, SIMULTANEOUSLY IMPLEMENTED AND FINANCED BY THE BENEFICIARY – MORE IN POINT. 6,6 WATER. CURRENT HIGH COSTS FOR LIGHTING PUBLIC PLACES: • GENERATE HIGH LIGHTING COSTS • INCREASE POLLUTION • HIGH LIGHTING COSTS CAUSE THAT THE NUMBER OF NEW INVESTMENTS DOES NOT INCREASE IN PROPORTION TO THE NEEDS • ARE RELATED TO THE UNUSED ENERGY-EFFICIENT AND ENVIRONMENTALLY FRIENDLY SYSTEMS (RES). TASKS: 1. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE TOWN OF KUNICE. 2. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE VILLAGE OF PRYMUSOWA WILL. 3. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE TOWN STONE. 4. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE LOCALITY CAUTIOUS. 5. PROMOTION OF THE PROJECT. 6. IT’S INVESTOR SUPERVISION. 7. CONNECTION TO THE PGE DISTRIBUTION NETWORK DETAILED TECHNICAL REQUIREMENTS. THEY'RE IN SW ROZ. 4 AND. 3. OBJECTIVES: THROUGH THE IMPLEMENTATION OF THE PROJECT, THE MAIN OBJECTIVE OF THE PROJECT WILL BE MET, I.E. INCREASING ENERGY SAVINGS AND IMPROVING AIR PURITY IN THE MUNICIPALITY OF SŁAWNO. TARGET GROUP: DIRECT: RESIDENTS OF THE MUNICIPALITY OF SŁAWNO, PASSIVE PERSONS, USING P INFRASTRUCTURE (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.03.02-10-0023/18
    0 references