Integrated Supply Supply System for the operation of the distribution network (Q80185)

From EU Knowledge Graph
Revision as of 14:32, 30 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q80185 in Poland
Language Label Description Also known as
English
Integrated Supply Supply System for the operation of the distribution network
Project Q80185 in Poland

    Statements

    0 references
    3,876,695.83 zloty
    0 references
    930,407.00 Euro
    13 January 2020
    0 references
    7,141,789.25 zloty
    0 references
    1,714,029.42 Euro
    13 January 2020
    0 references
    54.28 percent
    0 references
    1 June 2019
    0 references
    31 May 2022
    0 references
    PGE DYSTRYBUCJA S.A.
    0 references
    0 references

    51°13'5.5"N, 22°33'16.9"E
    0 references
    Przedmiotem projektu jest opracowanie modułowego zestawu urządzeń, dzięki którym możliwe będzie ograniczenie przerw w dostawie energii elektrycznej do odbiorców końcowych. Proponowane rozwiązanie - System bezprzerwowego zasilania odbiorców (SBZO), pozwoli na maksymalizację ciągłości dostaw elektryczności zarówno podczas planowanych prac remontowych związanych z modernizacją infrastruktury sieci dystrybucyjnej, jak i podczas prac związanych z usuwaniem awarii. Główne elementy układu to: rozdzielnica z transformatorem SN/nN oraz systemem przyłączeniowym (moduł 1), układ przekształtników oraz akumulator energii (moduł 2), agregaty prądotwórcze (moduł 3). Z uwagi na wykorzystanie nowoczesnych rozwiązań technologicznych tj. falowników dużej mocy, zasobnika energii, układu synchronizacji z siecią oraz realizacji połączeń w technologii prac pod napięciem (PPN) możliwe będzie bezprzerwowe przechodzenie zasilania z sieci dystrybucyjnej na zasilanie z SBZO i odwrotnie oraz rezerwowe zasilanie dużej ilości odbiorców w tym odbiorców o niespokojnym charakterze odbiorników przy zachowaniu selektywności działania zabezpieczeń. Opisywane rozwiązanie skierowane jest do Operatorów Sieci Dystrybucyjnych (OSD). Prace nad powyższymi kwestiami motywowane są potrzebą realizacji istotnych elementów strategii firm dystrybucyjnych, które wynikają m.in. z konieczności dostosowania się do obowiązujących aktów prawnych. Implementacja opisywanego rozwiązania może w sposób znaczący wpłynąć na wskaźniki SAIFI (wskaźnik przeciętnej, systemowej częstości przerw) oraz wskaźnik SAIDI (wskaźnik przeciętnego, systemowego czasu trwania przerwy), będące wyznacznikiem ewentualnej premii/kary dla OSD według obecnego prawodawstwa. Zgodnie z art. 25 rozporządzenia KE nr 651/2014 z dnia 17 czerwca 2014 r. uznające niektóre rodzaje pomocy za zgodne z rynkiem wewnętrznym w stosowaniu art. 107 i 108 Traktatu (Dz. Urz. UE L 187/1 z 26.06.2014). (Polish)
    0 references
    The subject of the project is the development of a modular set of devices, which will allow to limit interruptions in electricity supply to final customers. The proposed solution – The system of uninterrupted supply of customers (SBZO), will allow to maximise the continuity of electricity supply both during planned renovation works related to the modernisation of the distribution network infrastructure, as well as during failure recovery work. The main elements of the system are: switchgear with SN/nN transformer and connection system (module 1), converters system and energy battery (module 2), generators (module 3). Due to the use of modern technological solutions, i.e. high-power inverters, energy storage, synchronisation with the network and realisation of connections in voltage work technology (PPN), it will be possible to switch the power supply from the distribution network to power with SBZO and vice versa and reserve power supply of large numbers of recipients including receivers with restless nature of receivers while maintaining the selectivity of security. This solution is addressed to Distribution Network Operators (OSD). The work on the above issues is motivated by the need to implement important elements of the strategy of distribution companies, which result, among others, from the need to adapt to existing legal acts. Implementation of this solution can significantly affect SAIFI (average systemic break rate) and SAIDI (average, systemic break time) indicator, which determines a possible bonus/punishment for OSDs according to current legislation. Pursuant to Article 25 of Regulation (EC) No 651/2014 of 17 June 2014 declaring certain types of aid compatible with the internal market in the application of Articles 107 and 108 of the Treaty (OJ L. I'm sorry. EU L 187/1 of 26.06.2014). (English)
    14 October 2020
    0 references

    Identifiers

    POIR.01.02.00-00-0267/17
    0 references